{"componentChunkName":"component---src-templates-sezione-con-anticipazioni-template-en-jsx","path":"/en/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/","result":{"data":{"node":{"field_data":"2023-12-29T16:17:04+01:00","field_categoria_primaria":"sezione","title":"Bradyseism in the Phlegraean Fields","field_streaming_homepage":false,"field_agenda":false,"field_titolo_esteso":"Bradyseism in the Phlegraean Fields","field_titolo_sezione_accordion":null,"drupal_internal__nid":900011500,"field_id_contenuto_originale":900011499,"field_box_primo_piano_immagine":true,"body":null,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/"},"field_abstract":{"value":"
The Phlegraean Fields are a vast active volcanic area affected by the phenomenon of \"bradyseism\": a ground deformation involving slow lowering (subsidence) phases alternating with more rapid uplift phases, the latter generally followed by shallow, low-magnitude earthquakes.
\r\n\r\nA new uplift phase of the Phlegraean Fields caldera began in 2005 and is continuing. Since 2023, the frequency of earthquakes has gradually increased. The sequence peaked with the September 27 and October 2 earthquakes, which had magnitudes of 4.2 and 4.0, respectively.
\r\n\r\nAs a response to the ongoing bradyseismic crisis, volcano monitoring activities were strengthened, and, more broadly, prevention efforts of the Civil Protection System have been intensified. In particular, Decree-Law No. 140 of October 12, 2023, provided urgent measures to prevent seismic risk related to the bradyseismic phenomenon in the Phlegraean Fields area.
\r\n\r\nMap of Rapid Emergency Planning in the Phlegraean Fields
\r\n","processed":"The Phlegraean Fields are a vast active volcanic area affected by the phenomenon of \"bradyseism\": a ground deformation involving slow lowering (subsidence) phases alternating with more rapid uplift phases, the latter generally followed by shallow, low-magnitude earthquakes.
\nA new uplift phase of the Phlegraean Fields caldera began in 2005 and is continuing. Since 2023, the frequency of earthquakes has gradually increased. The sequence peaked with the September 27 and October 2 earthquakes, which had magnitudes of 4.2 and 4.0, respectively.
\nAs a response to the ongoing bradyseismic crisis, volcano monitoring activities were strengthened, and, more broadly, prevention efforts of the Civil Protection System have been intensified. In particular, Decree-Law No. 140 of October 12, 2023, provided urgent measures to prevent seismic risk related to the bradyseismic phenomenon in the Phlegraean Fields area.
\nMap of Rapid Emergency Planning in the Phlegraean Fields
\n"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_dettaglio":{"field_alt":"Campi Flegrei","field_didascalia":"Campi Flegrei","field_titolo_esteso":"Campi Flegrei 3 - in evidenza","relationships":{"image":{"localFile":{"publicURL":"/static/781ddadf2dd194a81bfda75c31f5a048/img-0960-evidenza.jpg","childImageSharp":{"fluid":{"aspectRatio":1.5027322404371584,"src":"/static/781ddadf2dd194a81bfda75c31f5a048/14b42/img-0960-evidenza.jpg","srcSet":"/static/781ddadf2dd194a81bfda75c31f5a048/cf463/img-0960-evidenza.jpg 275w,\n/static/781ddadf2dd194a81bfda75c31f5a048/dee3b/img-0960-evidenza.jpg 550w,\n/static/781ddadf2dd194a81bfda75c31f5a048/14b42/img-0960-evidenza.jpg 800w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}},"field_immagine_anteprima":{"field_alt":"Campi Flegrei 3 - primo piano","field_didascalia":"Campi Flegrei 3 - primo piano","relationships":{"image":{"localFile":{"publicURL":"/static/63b860a0a17585aa9f4a07c4c85ed24d/campi-flegrei-3-primo-piano.png","childImageSharp":{"fluid":{"aspectRatio":1.7857142857142858,"src":"/static/63b860a0a17585aa9f4a07c4c85ed24d/df498/campi-flegrei-3-primo-piano.png","srcSet":"/static/63b860a0a17585aa9f4a07c4c85ed24d/90683/campi-flegrei-3-primo-piano.png 275w,\n/static/63b860a0a17585aa9f4a07c4c85ed24d/1c1a5/campi-flegrei-3-primo-piano.png 550w,\n/static/63b860a0a17585aa9f4a07c4c85ed24d/df498/campi-flegrei-3-primo-piano.png 1100w,\n/static/63b860a0a17585aa9f4a07c4c85ed24d/5c6e9/campi-flegrei-3-primo-piano.png 1650w,\n/static/63b860a0a17585aa9f4a07c4c85ed24d/9337f/campi-flegrei-3-primo-piano.png 2049w","sizes":"(max-width: 1100px) 100vw, 1100px"}}}}}},"field_riferimento_traduzione":{"fields":{"slug":"/vulcanico/vulcani-italia/campi-flegrei/il-bradisismo-ai-campi-flegrei/"}},"field_accordion":[],"field_box_1_riga_1":[{"__typename":"node__page","title":"The current crisis","field_titolo_esteso":"The current crisis","body":{"processed":"A new uplift phase of the Phlegraean Fields caldera began in 2005 and is continuing. So far, as of November 2023, the maximum uplift achieved in the Rione Terra in Pozzuoli (the point of maximum deformation of the caldera) is about 118 cm, of which 85 cm since January 2016. From January 2023 to April 2024, the registered uplift is 17 cm.
\nSince 2018, this phenomenon has been followed by a gradual increase in seismic activity, the number of earthquakes, and their magnitude.
Seismicity. In 2023, while most events had low magnitudes (about 90% had magnitudes below 1.0), there was a new increase in the frequency of earthquakes. Most of the events occurred between Astroni, Solfatara-Pisciarelli-Agnano, Pozzuoli, and Gulf of Pozzuoli, with maximum depths of about 4 km, primarily concentrated in the first 2 km. The sequence peaked with the events of September 27 (Md 4.2) and October 2 (Md 4.0), located between Bagnoli and Pozzuoli and in the Pisciarelli-Solfatara area, respectively. In 2024, the most significant event, with a magnitude of 3.9, occurred on April 27.
\nComparison with the bradyseismic crisis of the 80's. The current situation is marked by ground uplifts and earthquakes of a magnitude comparable to those experienced in the bradyseismic crisis of 1982-84, while in terms of impact on buildings and infrastructure, the picture is very different. The crisis of the 1980s produced extensive damage to buildings, especially in the municipality of Pozzuoli, enough to require the evacuation of the population from their homes in the historic center, just as it happened during the bradyseismic crisis of the 1970s for the inhabitants of the Rione Terra.
\nThe current bradyseismic crisis has not caused substantial significant damage so far. The reasons are to be found in the different vulnerabilities of the buildings and the different evolution of the phenomenon in the frequency of quakes and the rate of uplift. Most of the structures in the area today consist of buildings not exceeding three stories, mostly made of reinforced concrete or masonry, which have undergone seismic retrofitting interventions since the 80's. To this end, with the Ministerial Decree issued by the Ministry of Public Works on March 7, 1981, the municipalities in the Phlegraean area were classified as seismic with the mandatory observance of technical regulations for construction.
Initial response to the crisis. The recent escalation of the bradyseismic crisis, culminating in September and October 2023 events, required the strengthening of volcano monitoring activities by Ingv and other Centers of Expertise and, more generally, a tightening of preventive measures by the Civil Protection System.
\nThe opinion of the National Major Risks Commission. In the last months of 2023, the Department has called the National Major Risks Commission - Volcanic and Seismic Risk Sector several times to know its opinion on the current situation and to perform further analysis and investigations, given the complex nature of the issue and the potential evolution of the volcano's dynamics. Several national and international experts were also involved to have further assessment elements.
\nAs a result of these meetings, the Commission found that the scientific findings reinforce the evidence for the presence of deep-seated magma as the root cause of the current bradyseismic crisis. However, without evidence of rising magma, it was concluded to confirm \"the yellow alert level for volcanic risk.\" Therefore, the Commission believes that monitoring activities by the Centers of Expertise and prevention activities by the various components of the National Service should be further strengthened and prepared for the potential need to increase the alert level.
\nThe issuance of the decree-law. Simultaneously, to provide an organic response to the effects of the ongoing bradyseismic crisis with both structural and nonstructural prevention measures, the government approved Decree-Law No. 140 of October 12, 2023, \"Urgent measures for the prevention of seismic risk related to the bradyseism phenomenon in the Phlegraean Fields area,\" which was subsequently converted into Law No. 183 of December 7, 2023. The decree defines the main actions the Civil Protection System must implement to effectively respond to a complex risk situation such as the one in the Phlegraean Fields area.
\n","value":"A new uplift phase of the Phlegraean Fields caldera began in 2005 and is continuing. So far, as of November 2023, the maximum uplift achieved in the Rione Terra in Pozzuoli (the point of maximum deformation of the caldera) is about 118 cm, of which 85 cm since January 2016. From January 2023 to April 2024, the registered uplift is 17 cm.
\r\nSince 2018, this phenomenon has been followed by a gradual increase in seismic activity, the number of earthquakes, and their magnitude.
Seismicity. In 2023, while most events had low magnitudes (about 90% had magnitudes below 1.0), there was a new increase in the frequency of earthquakes. Most of the events occurred between Astroni, Solfatara-Pisciarelli-Agnano, Pozzuoli, and Gulf of Pozzuoli, with maximum depths of about 4 km, primarily concentrated in the first 2 km. The sequence peaked with the events of September 27 (Md 4.2) and October 2 (Md 4.0), located between Bagnoli and Pozzuoli and in the Pisciarelli-Solfatara area, respectively. In 2024, the most significant event, with a magnitude of 3.9, occurred on April 27.
\r\n\r\nComparison with the bradyseismic crisis of the 80's. The current situation is marked by ground uplifts and earthquakes of a magnitude comparable to those experienced in the bradyseismic crisis of 1982-84, while in terms of impact on buildings and infrastructure, the picture is very different. The crisis of the 1980s produced extensive damage to buildings, especially in the municipality of Pozzuoli, enough to require the evacuation of the population from their homes in the historic center, just as it happened during the bradyseismic crisis of the 1970s for the inhabitants of the Rione Terra.
\r\nThe current bradyseismic crisis has not caused substantial significant damage so far. The reasons are to be found in the different vulnerabilities of the buildings and the different evolution of the phenomenon in the frequency of quakes and the rate of uplift. Most of the structures in the area today consist of buildings not exceeding three stories, mostly made of reinforced concrete or masonry, which have undergone seismic retrofitting interventions since the 80's. To this end, with the Ministerial Decree issued by the Ministry of Public Works on March 7, 1981, the municipalities in the Phlegraean area were classified as seismic with the mandatory observance of technical regulations for construction.
Initial response to the crisis. The recent escalation of the bradyseismic crisis, culminating in September and October 2023 events, required the strengthening of volcano monitoring activities by Ingv and other Centers of Expertise and, more generally, a tightening of preventive measures by the Civil Protection System.
\r\n\r\nThe opinion of the National Major Risks Commission. In the last months of 2023, the Department has called the National Major Risks Commission - Volcanic and Seismic Risk Sector several times to know its opinion on the current situation and to perform further analysis and investigations, given the complex nature of the issue and the potential evolution of the volcano's dynamics. Several national and international experts were also involved to have further assessment elements.
\r\n\r\nAs a result of these meetings, the Commission found that the scientific findings reinforce the evidence for the presence of deep-seated magma as the root cause of the current bradyseismic crisis. However, without evidence of rising magma, it was concluded to confirm \"the yellow alert level for volcanic risk.\" Therefore, the Commission believes that monitoring activities by the Centers of Expertise and prevention activities by the various components of the National Service should be further strengthened and prepared for the potential need to increase the alert level.
\r\n\r\nThe issuance of the decree-law. Simultaneously, to provide an organic response to the effects of the ongoing bradyseismic crisis with both structural and nonstructural prevention measures, the government approved Decree-Law No. 140 of October 12, 2023, \"Urgent measures for the prevention of seismic risk related to the bradyseism phenomenon in the Phlegraean Fields area,\" which was subsequently converted into Law No. 183 of December 7, 2023. The decree defines the main actions the Civil Protection System must implement to effectively respond to a complex risk situation such as the one in the Phlegraean Fields area.
\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/current-crisis/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Attuale crisi","field_didascalia":"Attuale crisi","relationships":{"image":{"localFile":{"publicURL":"/static/27e2a55ad35d83df59a947d1f0be6adc/crisis-eng-0.svg","childImageSharp":null}}}}}},{"__typename":"node__page","title":"The response of the National Service","field_titolo_esteso":"The response of the National Service","body":{"processed":"To provide an organic response to the ongoing bradyseismic crisis, with structural and nonstructural prevention measures, the government approved Decree-Law No. 140 of October 12, 2023, \"Urgent measures for the prevention of seismic risk related to the bradyseism phenomenon in the Phlegraean Fields area,\" which was later converted into Law No. 183 of December 7, 2023.
\nDecree-Law No. 140 of October 12, 2023. The measure outlines the main actions the Civil Protection System must implement to effectively respond to a complex risk situation such as the one of the Phlegraean Fields area. The analysis of the vulnerability of the built-up areas, the elaboration of an emergency plan dedicated to bradyseism, the definition of a communication plan to the population, and the assessment of the functioning of the transport infrastructure and other essential services are the major lines of activity in which the Civil Protection Department, the Campania Region and the Centers of Expertise with the most technical preparation and experience in this field in our country, namely the INGV-OV, the PLINIVS Study Centre, the Reluis Interuniversity Consortium, Eucentre, CNR-IREA, and CNR-IGAG, are engaged, working closely with the affected municipalities and the metropolitan city of Naples. In addition, the decree-law includes strengthening the territorial civil protection operational response.
\nThe vulnerability analysis plan for built-up areas. By the Decree of the Minister for Civil Protection and Sea Policies of February 26, 2024, in agreement with the Minister of Economy and Finance, a Rapid Emergency Plan, coordinated by the Department, was finally approved for analyzing the seismic vulnerability of the building heritage and local hazards in built-up areas through a new seismic microzonation study. The activities under this Plan apply to the intervention area, which was identified as part of the Rapid Emergency Planning for the area affected by bradyseism.
\nThese efforts are intended to support seismic redevelopment strategies and identify intervention priorities on private and public assets. A program to strengthen seismic and structure monitoring is also planned through integrating networks managed by the Ingv Vesuvius Observatory and the Civil Protection Department.
\nThe communication plan. As one of the urgent measures, the decree-law foresees the implementation of a Communication Plan to the population, coordinated by the Campania Region, to disseminate knowledge of risks, civil protection planning, and the correct behaviors to be adopted in the affected areas, focusing on people with disabilities.
\nMore specifically, the Plan is structured into macro-activities involving the implementation of awareness and service communication campaigns; the enhancement and standardization of institutional websites; the development of a regional app for citizens; the arrangement of regular meetings with the population and events targeting schools and universities in the areas affected by the phenomenon of bradyseism; the scheduling of cultural events and promoted by the third sector; the support of the information desks of the affected municipalities; the planning of open days of public facilities; the realization of training activities aimed at journalists, volunteers, school leaders, managers, officials and civil servants, including those of the affected municipalities; and the design, production and installation of multilingual street signs.
\nThe Plan was approved by Resolution No. 679 by the Regional Council of the Campania Region on November 23, 2023. It was published in the Official Bulletin of the Campania Region No. 86 on December 04, 2023.
\nThe Rapid Emergency Planning for bradyseism. Provided for in Article 4 of Decree-Law 140, this planning originates from the urgent need to define a specific strategy and operational procedures in response to the effects and possible consequences of bradyseism.
\nIt is drafted by the Civil Protection Department, in cooperation with the Campania Region, the Prefecture - UTG of Naples, and the relevant authorities and territorial administrations, according to the local and national civil protection plans and the risk knowledge elaborated by the Centers of Expertise.
\nThe assessment of transportation infrastructure and essential services. The Campania Region is also coordinating activities with the affected municipalities to assess and identify critical issues that need to be overcome to ensure the functionality of transportation infrastructure and other essential services and to support the updating of planning for bradyseism. By Resolution No. 7 of the Regional Council dated January 10, 2024, the \" Urgent measures to verify the functionality of transportation infrastructure and other essential services\" were approved.
\n\n","value":"
To provide an organic response to the ongoing bradyseismic crisis, with structural and nonstructural prevention measures, the government approved Decree-Law No. 140 of October 12, 2023, \"Urgent measures for the prevention of seismic risk related to the bradyseism phenomenon in the Phlegraean Fields area,\" which was later converted into Law No. 183 of December 7, 2023.
\r\n\r\nDecree-Law No. 140 of October 12, 2023. The measure outlines the main actions the Civil Protection System must implement to effectively respond to a complex risk situation such as the one of the Phlegraean Fields area. The analysis of the vulnerability of the built-up areas, the elaboration of an emergency plan dedicated to bradyseism, the definition of a communication plan to the population, and the assessment of the functioning of the transport infrastructure and other essential services are the major lines of activity in which the Civil Protection Department, the Campania Region and the Centers of Expertise with the most technical preparation and experience in this field in our country, namely the INGV-OV, the PLINIVS Study Centre, the Reluis Interuniversity Consortium, Eucentre, CNR-IREA, and CNR-IGAG, are engaged, working closely with the affected municipalities and the metropolitan city of Naples. In addition, the decree-law includes strengthening the territorial civil protection operational response.
\r\n\r\nThe vulnerability analysis plan for built-up areas. By the Decree of the Minister for Civil Protection and Sea Policies of February 26, 2024, in agreement with the Minister of Economy and Finance, a Rapid Emergency Plan, coordinated by the Department, was finally approved for analyzing the seismic vulnerability of the building heritage and local hazards in built-up areas through a new seismic microzonation study. The activities under this Plan apply to the intervention area, which was identified as part of the Rapid Emergency Planning for the area affected by bradyseism.
\r\n\r\nThese efforts are intended to support seismic redevelopment strategies and identify intervention priorities on private and public assets. A program to strengthen seismic and structure monitoring is also planned through integrating networks managed by the Ingv Vesuvius Observatory and the Civil Protection Department.
\r\n\r\nThe communication plan. As one of the urgent measures, the decree-law foresees the implementation of a Communication Plan to the population, coordinated by the Campania Region, to disseminate knowledge of risks, civil protection planning, and the correct behaviors to be adopted in the affected areas, focusing on people with disabilities.
\r\n\r\nMore specifically, the Plan is structured into macro-activities involving the implementation of awareness and service communication campaigns; the enhancement and standardization of institutional websites; the development of a regional app for citizens; the arrangement of regular meetings with the population and events targeting schools and universities in the areas affected by the phenomenon of bradyseism; the scheduling of cultural events and promoted by the third sector; the support of the information desks of the affected municipalities; the planning of open days of public facilities; the realization of training activities aimed at journalists, volunteers, school leaders, managers, officials and civil servants, including those of the affected municipalities; and the design, production and installation of multilingual street signs.
\r\n\r\nThe Plan was approved by Resolution No. 679 by the Regional Council of the Campania Region on November 23, 2023. It was published in the Official Bulletin of the Campania Region No. 86 on December 04, 2023.
\r\n\r\nThe Rapid Emergency Planning for bradyseism. Provided for in Article 4 of Decree-Law 140, this planning originates from the urgent need to define a specific strategy and operational procedures in response to the effects and possible consequences of bradyseism.
\r\n\r\nIt is drafted by the Civil Protection Department, in cooperation with the Campania Region, the Prefecture - UTG of Naples, and the relevant authorities and territorial administrations, according to the local and national civil protection plans and the risk knowledge elaborated by the Centers of Expertise.
\r\n\r\nThe assessment of transportation infrastructure and essential services. The Campania Region is also coordinating activities with the affected municipalities to assess and identify critical issues that need to be overcome to ensure the functionality of transportation infrastructure and other essential services and to support the updating of planning for bradyseism. By Resolution No. 7 of the Regional Council dated January 10, 2024, the \" Urgent measures to verify the functionality of transportation infrastructure and other essential services\" were approved.
\r\n\r\n\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Risposta del Servizio Nazionale","field_didascalia":"Risposta del Servizio Nazionale","relationships":{"image":{"localFile":{"publicURL":"/static/0fdcb480d5b17ab790bb617933ba4022/response-eng.svg","childImageSharp":null}}}}}}],"field_box_1_riga_2":[{"__typename":"node__timeline","field_titolo_esteso":"Timeline","field_abstract":null,"field_categoria_primaria":"timeline","fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/timeline/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Il bradisismo ai Campi Flegrei. Linea del tempo","field_didascalia":"Il bradisismo ai Campi Flegrei. Linea del tempo","relationships":{"image":{"localFile":{"publicURL":"/static/f33c143ffa1bca7d9fed079514f27e1b/timeline-eng.svg","childImageSharp":null}}}}}},{"__typename":"node__page","title":"Questions and answers","field_titolo_esteso":"Q&A","body":null,"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/qa/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Questions and answers","field_didascalia":"Questions and answers","relationships":{"image":{"localFile":{"publicURL":"/static/1b1ef2db7a335e450b54613f6cd195b1/qa.svg","childImageSharp":null}}}}}}],"field_box_1_riga_3":[{"__typename":"node__page","title":"Are you prepared?","field_titolo_esteso":"Are you prepared?","body":{"processed":"
Bradyseism consists of phases of slow ground lowering, alternating with phases of more rapid ground uplift. The uplift can be accompanied by seismic activity with events that usually do not reach high magnitudes. However, since they are very shallow, they are easily perceived and can damage infrastructure and buildings. Therefore, knowing what to do in case of an earthquake is essential.
\n","value":"Bradyseism consists of phases of slow ground lowering, alternating with phases of more rapid ground uplift. The uplift can be accompanied by seismic activity with events that usually do not reach high magnitudes. However, since they are very shallow, they are easily perceived and can damage infrastructure and buildings. Therefore, knowing what to do in case of an earthquake is essential.
\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/are-you-prepared/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Sei preparato?","field_didascalia":"Sei preparato?","relationships":{"image":{"localFile":{"publicURL":"/static/f395c2dbc7d23a5b63ad5985be1a6ca0/prepared-eng.svg","childImageSharp":null}}}}}},{"__typename":"node__page","title":"The phenomenon","field_titolo_esteso":"The phenomenon","body":{"processed":"Description. \"Bradyseism\" comes from the Greek bradýs (βραδύς), meaning \"slow,\" and seismós (σεισμός), meaning \"movement.\" It is a ground deformation involving slow lowering (subsidence) phases alternating with more rapid uplift phases. Although with specific characteristics, the phenomenon occurs in several volcanic calderas worldwide (e.g., Long Valley, USA; Rabaul, Papua New Guinea), including the Italian Phlegraean Fields. Rapid uplift can be followed by several earthquakes (earthquake swarms) that usually do not reach high magnitudes but are very shallow, easily perceived, and could sometimes damage buildings and infrastructure.
\nCauses. The ground deformations that typify bradyseism, with which seismic activity is associated, are linked to the volcanic dynamic of the caldera.
\nCalderas are volcanic structures that are morphologically lowered, unlike the typical cone-building volcano. Specific studies of caldera activity suggest that periods of \"unrest\" of prolonged duration are often non-eruptive, meaning that bradyseismic crises often do not culminate in an eruption. However, sometimes, \"unrest\" phases can precede an eruption.
\nConcerning the causes of the uplift, there is still debate within the scientific community. Some researchers ascribe it to increased temperatures and pressure of fluids in the hydrothermal system, reacting to degassing events also caused by magma ascent; others believe, however, that the phenomenon is directly related, in whole or in part, to magma inputs at shallow magma chamber levels.
Effects. Slow ground deformation in the rapid uplift phase, combined with seismic activity, could compromise the functionality of some infrastructures (such as water and gas networks or harbor docks) but also cause minor damage to nonstructural elements of buildings, with cracks forming or plaster falling off and doors and windows losing their orthogonality, enough to affect their smooth opening/closing. On the other hand, seismic sequences of significant magnitude (M=4-4.5) and with high frequencies (several events per day) are likely to cause potentially more substantial damage.
\n","value":"Description. \"Bradyseism\" comes from the Greek bradýs (βραδύς), meaning \"slow,\" and seismós (σεισμός), meaning \"movement.\" It is a ground deformation involving slow lowering (subsidence) phases alternating with more rapid uplift phases. Although with specific characteristics, the phenomenon occurs in several volcanic calderas worldwide (e.g., Long Valley, USA; Rabaul, Papua New Guinea), including the Italian Phlegraean Fields. Rapid uplift can be followed by several earthquakes (earthquake swarms) that usually do not reach high magnitudes but are very shallow, easily perceived, and could sometimes damage buildings and infrastructure.
\r\n\r\nCauses. The ground deformations that typify bradyseism, with which seismic activity is associated, are linked to the volcanic dynamic of the caldera.
\r\nCalderas are volcanic structures that are morphologically lowered, unlike the typical cone-building volcano. Specific studies of caldera activity suggest that periods of \"unrest\" of prolonged duration are often non-eruptive, meaning that bradyseismic crises often do not culminate in an eruption. However, sometimes, \"unrest\" phases can precede an eruption.
\r\nConcerning the causes of the uplift, there is still debate within the scientific community. Some researchers ascribe it to increased temperatures and pressure of fluids in the hydrothermal system, reacting to degassing events also caused by magma ascent; others believe, however, that the phenomenon is directly related, in whole or in part, to magma inputs at shallow magma chamber levels.
Effects. Slow ground deformation in the rapid uplift phase, combined with seismic activity, could compromise the functionality of some infrastructures (such as water and gas networks or harbor docks) but also cause minor damage to nonstructural elements of buildings, with cracks forming or plaster falling off and doors and windows losing their orthogonality, enough to affect their smooth opening/closing. On the other hand, seismic sequences of significant magnitude (M=4-4.5) and with high frequencies (several events per day) are likely to cause potentially more substantial damage.
\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/phenomenon/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Fenomeno","field_didascalia":"Fenomeno","relationships":{"image":{"localFile":{"publicURL":"/static/0908590cd74687f498fa1650520363bc/fenomeno.svg","childImageSharp":null}}}}}}],"field_box_2_riga_1":[{"__typename":"node__page","title":"Monitoring","field_titolo_esteso":"Monitoring","body":{"processed":"The main difference between last century's bradyseismic crisis and the current one is in the improved technological ability to use dense multiparameter monitoring networks with high sensitivity and reliability and to follow the development of the phenomenon in real or near-real time.
\nThe monitoring and surveillance activities of the Phlegraean Fields are provided by the National Institute of Geophysics and Volcanology - Vesuvius Observatory (INGV-OV) through a network of instruments intended for the analysis of seismicity, ground deformation, and physicochemical characteristics of gases, which together allow to define and evaluate the state of activity of the volcano. Monitoring through multiparameter instrumental networks, also implemented thanks to the economic contribution of the Campania Region, is integrated with periodic field measurement campaigns and laboratory analyses, which provide a comprehensive overview of volcanic dynamics. Details and updates on monitoring activities are available on the INGV-OV website.
\nThe National Research Council's Institute for Electromagnetic Sensing of the Environment (CNR-IREA) also contributes to ground deformation monitoring through satellite radar interferometry analyses.
\n","value":"The main difference between last century's bradyseismic crisis and the current one is in the improved technological ability to use dense multiparameter monitoring networks with high sensitivity and reliability and to follow the development of the phenomenon in real or near-real time.
\r\n\r\nThe monitoring and surveillance activities of the Phlegraean Fields are provided by the National Institute of Geophysics and Volcanology - Vesuvius Observatory (INGV-OV) through a network of instruments intended for the analysis of seismicity, ground deformation, and physicochemical characteristics of gases, which together allow to define and evaluate the state of activity of the volcano. Monitoring through multiparameter instrumental networks, also implemented thanks to the economic contribution of the Campania Region, is integrated with periodic field measurement campaigns and laboratory analyses, which provide a comprehensive overview of volcanic dynamics. Details and updates on monitoring activities are available on the INGV-OV website.
\r\n\r\nThe National Research Council's Institute for Electromagnetic Sensing of the Environment (CNR-IREA) also contributes to ground deformation monitoring through satellite radar interferometry analyses.
\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/monitoring/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Monitoraggio","field_didascalia":"Monitoraggio","relationships":{"image":{"localFile":{"publicURL":"/static/45144b8da0a8f2d841409c2c49eddbf2/monitoring-eng.svg","childImageSharp":null}}}}}},{"__typename":"node__page","title":"Past events","field_titolo_esteso":"Past events","body":{"processed":"The reconstruction of the progression of bradyseism in the Phlegraean Fields has been possible since the early 1800s thanks to observations made on the ruins of the Serapeum, a Roman market dating back to the 1st - 2nd century AD, located a few meters from the port of Pozzuoli. Thanks to the dating of the holes produced by marine mollusks at various heights on the columns of the Serapeo, it was possible to reconstruct the sea level oscillations over the centuries due to the uplift or lowering of the ground. More recently, since 1905, geodetic leveling techniques and, in recent decades, satellite measurements (GPS and interferometry) have made it possible to measure ground movements more accurately and thus to monitor the phenomenon of bradyseism.
\nEarly data from the leveling network show that between 1905 and 1945, the Phlegraean Fields area was affected by continuous subsidence, equal to about 100 cm measured near the \"Serapeo,\" with an average rate of about 2.5 cm/year. Afterward, there was a trend reversal because, between 1945 and 1953, the ground began to rise again by more than 50 cm without significant seismicity. In 1970-72 and 1982-84, two intense bradyseismic crises followed.
\nThe crisis of the '70s. The bradyseismic crisis between 1970 and 1972 was marked by a total uplift (started in 1968) of about 177 cm, with a maximum rate of 6.2 cm/month. In early 1970, numerous cracks were reported in the dry-stone walls that protected the Cumana railway route and some buildings in the historic center of Pozzuoli. Fishermen reported several pieces of evidence that pointed to an uplift of the ground, such as the different inclination of the ferry gangways or the uplift of an arch in the small harbor, under which boatmen could pass for a few months while standing on their boats.
\nThe uplift was accompanied by earthquake swarms with low magnitude, primarily unnoticed by the population. In particular, about 2600 quakes were recorded between February 28 and October 30, 1970, all with low magnitude (M<2.0), focused in the central zone of maximum caldera uplift. On March 3, 1970, the evacuation of the Rione Terra began, as many of the houses showed cracks, and it was feared they could not resist possible stronger seismic quakes. The people displaced from their homes were placed in a hospital and several hotels along the Domitian coast, waiting for the development of the future Rione Toiano. After the crisis, a slow phase of ground lowering to about 21 cm from the maximum uplift began.
\nFollowing the events, a particular Law (No. 475 of July 19, 1971) was issued, mandating adherence to the requirements valid for second-category seismic zones for new construction within the municipality of Pozzuoli.
\nThe crisis of the '80s. The following bradyseismic crisis occurred between 1982 and 1984 and reached a maximum uplift of 179 cm, totaling 334 cm since 1970. The maximum uplift rate was 14.5 cm/month. Earthquakes and intense swarms accompanied the uplift: over 16,000 events were recorded during the crisis, with two quakes of M=4.0.
\nIn particular, seismicity became significant in the spring of 1983. From that time on, the buildings of Pozzuoli were under continuous seismic stress with small energy but widespread events and more isolated events of higher energy. A significant increase in seismic activity occurred between September 4 and October 4, 1983, when an earthquake of M=4.0 occurred with an epicenter near the Solfatara and a depth between 2.5 and 3.0 km. The event resulted in damage and panic in the city of Pozzuoli. The earthquake was felt in a radius of more than 30 km. The intensity in the epicentral area (Pozzuoli) was grade VII on the MCS scale, while in parts of Naples, it was grade VI. As a result of the damage to many buildings in Pozzuoli due to the continuous seismic stresses, it was again decided to evacuate part of the population, which, after an initial period spent in the tourist resorts of the Domitian coast, was housed in the new neighborhood of the Monteruscello area. During the last months of 1984, the phenomenon's intensity decreased, and the seismic crisis closed with the December 8 earthquake event of M=3.8.
\nFrom 1985, the activity was again characterized by a phase of ground subsidence, which reached a total value of about 94 cm in November 2004. During this period, there were three brief episodes of uplift, in 1989, 1994, and 2000, all less than 10 cm, accompanied by low-magnitude seismic swarms.
\n","value":"The reconstruction of the progression of bradyseism in the Phlegraean Fields has been possible since the early 1800s thanks to observations made on the ruins of the Serapeum, a Roman market dating back to the 1st - 2nd century AD, located a few meters from the port of Pozzuoli. Thanks to the dating of the holes produced by marine mollusks at various heights on the columns of the Serapeo, it was possible to reconstruct the sea level oscillations over the centuries due to the uplift or lowering of the ground. More recently, since 1905, geodetic leveling techniques and, in recent decades, satellite measurements (GPS and interferometry) have made it possible to measure ground movements more accurately and thus to monitor the phenomenon of bradyseism.
\r\n\r\nEarly data from the leveling network show that between 1905 and 1945, the Phlegraean Fields area was affected by continuous subsidence, equal to about 100 cm measured near the \"Serapeo,\" with an average rate of about 2.5 cm/year. Afterward, there was a trend reversal because, between 1945 and 1953, the ground began to rise again by more than 50 cm without significant seismicity. In 1970-72 and 1982-84, two intense bradyseismic crises followed.
\r\n\r\nThe crisis of the '70s. The bradyseismic crisis between 1970 and 1972 was marked by a total uplift (started in 1968) of about 177 cm, with a maximum rate of 6.2 cm/month. In early 1970, numerous cracks were reported in the dry-stone walls that protected the Cumana railway route and some buildings in the historic center of Pozzuoli. Fishermen reported several pieces of evidence that pointed to an uplift of the ground, such as the different inclination of the ferry gangways or the uplift of an arch in the small harbor, under which boatmen could pass for a few months while standing on their boats.
\r\n\r\nThe uplift was accompanied by earthquake swarms with low magnitude, primarily unnoticed by the population. In particular, about 2600 quakes were recorded between February 28 and October 30, 1970, all with low magnitude (M<2.0), focused in the central zone of maximum caldera uplift. On March 3, 1970, the evacuation of the Rione Terra began, as many of the houses showed cracks, and it was feared they could not resist possible stronger seismic quakes. The people displaced from their homes were placed in a hospital and several hotels along the Domitian coast, waiting for the development of the future Rione Toiano. After the crisis, a slow phase of ground lowering to about 21 cm from the maximum uplift began.
\r\n\r\nFollowing the events, a particular Law (No. 475 of July 19, 1971) was issued, mandating adherence to the requirements valid for second-category seismic zones for new construction within the municipality of Pozzuoli.
\r\n\r\nThe crisis of the '80s. The following bradyseismic crisis occurred between 1982 and 1984 and reached a maximum uplift of 179 cm, totaling 334 cm since 1970. The maximum uplift rate was 14.5 cm/month. Earthquakes and intense swarms accompanied the uplift: over 16,000 events were recorded during the crisis, with two quakes of M=4.0.
\r\n\r\nIn particular, seismicity became significant in the spring of 1983. From that time on, the buildings of Pozzuoli were under continuous seismic stress with small energy but widespread events and more isolated events of higher energy. A significant increase in seismic activity occurred between September 4 and October 4, 1983, when an earthquake of M=4.0 occurred with an epicenter near the Solfatara and a depth between 2.5 and 3.0 km. The event resulted in damage and panic in the city of Pozzuoli. The earthquake was felt in a radius of more than 30 km. The intensity in the epicentral area (Pozzuoli) was grade VII on the MCS scale, while in parts of Naples, it was grade VI. As a result of the damage to many buildings in Pozzuoli due to the continuous seismic stresses, it was again decided to evacuate part of the population, which, after an initial period spent in the tourist resorts of the Domitian coast, was housed in the new neighborhood of the Monteruscello area. During the last months of 1984, the phenomenon's intensity decreased, and the seismic crisis closed with the December 8 earthquake event of M=3.8.
\r\n\r\nFrom 1985, the activity was again characterized by a phase of ground subsidence, which reached a total value of about 94 cm in November 2004. During this period, there were three brief episodes of uplift, in 1989, 1994, and 2000, all less than 10 cm, accompanied by low-magnitude seismic swarms.
\r\n"},"field_abstract":null,"field_categoria_primaria":"pagina","field_codice_lingua":true,"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/past-events/"},"relationships":{"field_sottodominio":{"name":"Rischi"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Eventi del passato","field_didascalia":"Eventi del passato","relationships":{"image":{"localFile":{"publicURL":"/static/134d514435943d054443105c714aca79/past-event-eng_0.svg","childImageSharp":null}}}}}}],"field_box_2_riga_2":[],"field_box_2_riga_3":[],"field_box_3_riga_1":[],"field_box_3_riga_2":[],"field_box_3_riga_3":[],"field_box_rullo_1":{"field_titolo":"News","field_tipologia":"0","relationships":{"field_contenuto":[{"__typename":"node__notizia","title":"Bradyseism in the Phlegraean Fields, a meeting with the citizens of Bacoli","field_titolo_esteso":"Bradyseism in the Phlegraean Fields, a meeting with the citizens of Bacoli","body":{"processed":"The Municipality of Bacoli, the Campania Region, and the Civil Protection Department will hold a meeting on May 6 at 3:30 p.m. to inform the citizens about the ongoing phenomenon of bradyseism in the volcanic area of the Phlegraean Fields. The meeting will take place at the Parco Borbonico del Fusaro, Sala dell'Ostrichina in Bacoli.
\nThe event, which follows the one held on April 11 in Pozzuoli, is part of the Communication Plan developed by the Campania Region in cooperation with the Department under Decree-Law 140 of October 12. This plan aims to provide the public with the latest information regarding the ongoing crisis of bradyseism and the measures implemented by the Decree-Law.
\nDuring the meeting, officials will answer frequently asked questions from citizens regarding the response of the civil protection system, as well as provide scientific perspectives.
\nOther than the Mayor of Pozzuoli, who is the host of the event, the Head of the Civil Protection Department, along with Deputy Head, Regional Councillor for Security, Law, and Immigration, Director General of Civil Protection of Campania Region, Prefect of Naples, and Mayor's delegate are attending as representatives of the institutions. From the scientific research bodies, the attendees include the Director of the Ingv Volcanoes Department, the Director of the Ingv-Vesuvius Observatory, the President of the Network of the University Laboratories of Seismic Engineering (Reluis), and the Scientific Director of the PLINIVS Study Center. The coordinator of the Campania Region's civil protection press office will moderate the meeting.
\n","value":"The Municipality of Bacoli, the Campania Region, and the Civil Protection Department will hold a meeting on May 6 at 3:30 p.m. to inform the citizens about the ongoing phenomenon of bradyseism in the volcanic area of the Phlegraean Fields. The meeting will take place at the Parco Borbonico del Fusaro, Sala dell'Ostrichina in Bacoli.
\r\n\r\nThe event, which follows the one held on April 11 in Pozzuoli, is part of the Communication Plan developed by the Campania Region in cooperation with the Department under Decree-Law 140 of October 12. This plan aims to provide the public with the latest information regarding the ongoing crisis of bradyseism and the measures implemented by the Decree-Law.
\r\n\r\nDuring the meeting, officials will answer frequently asked questions from citizens regarding the response of the civil protection system, as well as provide scientific perspectives.
\r\n\r\nOther than the Mayor of Pozzuoli, who is the host of the event, the Head of the Civil Protection Department, along with Deputy Head, Regional Councillor for Security, Law, and Immigration, Director General of Civil Protection of Campania Region, Prefect of Naples, and Mayor's delegate are attending as representatives of the institutions. From the scientific research bodies, the attendees include the Director of the Ingv Volcanoes Department, the Director of the Ingv-Vesuvius Observatory, the President of the Network of the University Laboratories of Seismic Engineering (Reluis), and the Scientific Director of the PLINIVS Study Center. The coordinator of the Campania Region's civil protection press office will moderate the meeting.
\r\n"},"field_abstract":{"processed":"Head of Department Fabrizio Curcio will also attend the meeting
\n","value":"Head of Department Fabrizio Curcio will also attend the meeting
\r\n"},"field_data":"2024-05-06T14:27:13+02:00","field_categoria_primaria":"notizia","field_codice_lingua":true,"fields":{"slug":"/notizia/bradyseism-phlegraean-fields-meeting-citizens-bacoli/"},"relationships":{"field_sottodominio":{"name":"Portale"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Campi Flegrei","field_didascalia":"Campi Flegrei","relationships":{"image":{"localFile":{"publicURL":"/static/526f83094a00547196fcb69773c4ecd9/campi-flegrei-evidenza.jpg","childImageSharp":{"fluid":{"aspectRatio":1.5037593984962405,"src":"/static/526f83094a00547196fcb69773c4ecd9/14b42/campi-flegrei-evidenza.jpg","srcSet":"/static/526f83094a00547196fcb69773c4ecd9/f836f/campi-flegrei-evidenza.jpg 200w,\n/static/526f83094a00547196fcb69773c4ecd9/2244e/campi-flegrei-evidenza.jpg 400w,\n/static/526f83094a00547196fcb69773c4ecd9/14b42/campi-flegrei-evidenza.jpg 800w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}}}},{"__typename":"node__comunicato_stampa","title":"Terremoto: magnitudo 3.9 in Area Flegrea","field_data":"2024-04-27T08:37:49+02:00","field_titolo_esteso":"Terremoto: magnitudo 3.9 in Area Flegrea","body":{"processed":"Dalle ore 1.38, come segnalato dall’Istituto Nazionale di Geofisica e Vulcanologia, è in corso uno sciame sismico nell’area dei Campi Flegrei, 47 eventi sismici con l’evento maggiore registrato di magnitudo 3.9.
\nIn seguito all’evento la Sala Situazione Italia del Dipartimento della Protezione Civile si è messa in contatto con le strutture locali del Servizio Nazionale della protezione civile.
\nLa scossa è stata avvertita dalla popolazione ma dalle verifiche NON sono stati segnalati danni.
\n","value":"Dalle ore 1.38, come segnalato dall’Istituto Nazionale di Geofisica e Vulcanologia, è in corso uno sciame sismico nell’area dei Campi Flegrei, 47 eventi sismici con l’evento maggiore registrato di magnitudo 3.9.
\r\n\r\nIn seguito all’evento la Sala Situazione Italia del Dipartimento della Protezione Civile si è messa in contatto con le strutture locali del Servizio Nazionale della protezione civile.
\r\n\r\nLa scossa è stata avvertita dalla popolazione ma dalle verifiche NON sono stati segnalati danni.
\r\n"},"field_categoria_primaria":"comunicato_stampa","field_codice_lingua":true,"field_abstract":{"processed":"Dalle verifiche non segnalati danni. Aggiornamento ore 8 del 27 aprile
\n","value":"Dalle verifiche non segnalati danni. Aggiornamento ore 8 del 27 aprile
\r\n"},"fields":{"slug":"/comunicato-stampa/terremoto-magnitudo-39-area-flegrea-0/"},"relationships":{"field_sottodominio":{"name":"Portale"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"Registrazione terremoto","field_didascalia":"Registrazione terremoto","relationships":{"image":{"localFile":{"publicURL":"/static/87128a44c74084ac4cb47f01f635b5ab/terremoto-img-5540_0.jpg","childImageSharp":{"fluid":{"aspectRatio":1.5037593984962405,"src":"/static/87128a44c74084ac4cb47f01f635b5ab/14b42/terremoto-img-5540_0.jpg","srcSet":"/static/87128a44c74084ac4cb47f01f635b5ab/f836f/terremoto-img-5540_0.jpg 200w,\n/static/87128a44c74084ac4cb47f01f635b5ab/2244e/terremoto-img-5540_0.jpg 400w,\n/static/87128a44c74084ac4cb47f01f635b5ab/14b42/terremoto-img-5540_0.jpg 800w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}}}},{"__typename":"node__comunicato_stampa","title":"Conclusa esercitazione su bradisismo ai Campi Flegrei","field_data":"2024-04-22T16:35:25+02:00","field_titolo_esteso":"Conclusa esercitazione su bradisismo ai Campi Flegrei","body":{"processed":"\"In protezione civile non esiste una pianificazione ideale, data una volta per tutte: piani e procedure funzionano solo se sono costantemente messi alla prova, testati e perfezionati\" Così il Capo Dipartimento Fabrizio Curcio ha commentato l'esercitazione “per posti di comando” sul bradisismo svoltasi stamattina. \"Questo è ancora più vero per in un'area come quella dei Campi Flegrei, - ha proseguito Curcio - dove coesistono diversi fattori di rischio ed è quindi necessario testare scenari diversi per essere pronti in caso di emergenza. Oggi l'esercitazione ha coinvolto principalmente gli addetti ai lavori, per verificare l’operatività dei centri di coordinamento e delle sale operative, e nei prossimi mesi continueremo a lavorare con il territorio per altre due simulazioni, a maggio e a ottobre, con la consapevolezza che le esercitazioni servono a far emergere possibili criticità e individuare insieme le soluzioni.\"
\nQuella che si è tenuta oggi è la prima delle tre esercitazioni di protezione civile previste per il 2024 in area flegrea, organizzata dal Dipartimento della Protezione Civile, d’intesa con la Regione Campania, con il coinvolgimento della Città Metropolitana e della Prefettura-UGT di Napoli, nonché dei comuni interessati. Oltre all’attivazione delle sale e dei centri di coordinamento, la giornata di test ha previsto anche le evacuazioni di quattro plessi scolastici: l’istituto Madonna Assunta a Bagnoli nel comune di Napoli, l’istituto Paolo di Tarso a Bacoli, e le scuole San Giuseppe e Giacinto Diano a Pozzuoli.
\nLa prossima tappa del percorso esercitativo, incentrata sulle procedure operative definite dal Piano speditivo di emergenza per l’area del bradisismo, è fissata per il 30 e 31 maggio, a cui ne seguirà una terza nel mese di ottobre 2024 per testare il Piano nazionale per il rischio vulcanico ai Campi Flegrei.
\n","value":"\"In protezione civile non esiste una pianificazione ideale, data una volta per tutte: piani e procedure funzionano solo se sono costantemente messi alla prova, testati e perfezionati\" Così il Capo Dipartimento Fabrizio Curcio ha commentato l'esercitazione “per posti di comando” sul bradisismo svoltasi stamattina. \"Questo è ancora più vero per in un'area come quella dei Campi Flegrei, - ha proseguito Curcio - dove coesistono diversi fattori di rischio ed è quindi necessario testare scenari diversi per essere pronti in caso di emergenza. Oggi l'esercitazione ha coinvolto principalmente gli addetti ai lavori, per verificare l’operatività dei centri di coordinamento e delle sale operative, e nei prossimi mesi continueremo a lavorare con il territorio per altre due simulazioni, a maggio e a ottobre, con la consapevolezza che le esercitazioni servono a far emergere possibili criticità e individuare insieme le soluzioni.\"
\r\n\r\nQuella che si è tenuta oggi è la prima delle tre esercitazioni di protezione civile previste per il 2024 in area flegrea, organizzata dal Dipartimento della Protezione Civile, d’intesa con la Regione Campania, con il coinvolgimento della Città Metropolitana e della Prefettura-UGT di Napoli, nonché dei comuni interessati. Oltre all’attivazione delle sale e dei centri di coordinamento, la giornata di test ha previsto anche le evacuazioni di quattro plessi scolastici: l’istituto Madonna Assunta a Bagnoli nel comune di Napoli, l’istituto Paolo di Tarso a Bacoli, e le scuole San Giuseppe e Giacinto Diano a Pozzuoli.
\r\n\r\nLa prossima tappa del percorso esercitativo, incentrata sulle procedure operative definite dal Piano speditivo di emergenza per l’area del bradisismo, è fissata per il 30 e 31 maggio, a cui ne seguirà una terza nel mese di ottobre 2024 per testare il Piano nazionale per il rischio vulcanico ai Campi Flegrei.
\r\n"},"field_categoria_primaria":"comunicato_stampa","field_codice_lingua":true,"field_abstract":{"processed":"\"Piani e procedure funzionano solo se sono costantemente messi alla prova, testati e perfezionati\"
\n","value":"\"Piani e procedure funzionano solo se sono costantemente messi alla prova, testati e perfezionati\"
\r\n"},"fields":{"slug":"/comunicato-stampa/conclusa-esercitazione-su-bradisismo-ai-campi-flegrei-0/"},"relationships":{"field_sottodominio":{"name":"Portale"},"field_immagine_anteprima":null,"field_immagine_dettaglio":{"field_alt":"EXE Bradisimo Flegrei 2024 ","field_didascalia":"EXE Bradisimo Flegrei 2024 ","relationships":{"image":{"localFile":{"publicURL":"/static/b1b75fb4207868cf9ffb83dc7c2b9cf0/logo-exe-flegrei-evidenza_1.png","childImageSharp":{"fluid":{"aspectRatio":1.5037593984962405,"src":"/static/b1b75fb4207868cf9ffb83dc7c2b9cf0/ee604/logo-exe-flegrei-evidenza_1.png","srcSet":"/static/b1b75fb4207868cf9ffb83dc7c2b9cf0/69585/logo-exe-flegrei-evidenza_1.png 200w,\n/static/b1b75fb4207868cf9ffb83dc7c2b9cf0/497c6/logo-exe-flegrei-evidenza_1.png 400w,\n/static/b1b75fb4207868cf9ffb83dc7c2b9cf0/ee604/logo-exe-flegrei-evidenza_1.png 800w","sizes":"(max-width: 800px) 100vw, 800px"}}}}}}}}],"field_link_vedi_tutti":{"__typename":"node__elenco_notizie_comunicati_stampa","title":"Latest news","field_titolo_esteso":"Latest news","field_abstract":null,"fields":{"slug":"/latest-news/"},"relationships":{"field_sottodominio":{"name":"Portale"},"field_immagine_anteprima":null,"field_immagine_dettaglio":null}}}},"field_box_rullo_2":{"field_titolo":"Legal measures","field_tipologia":"1","relationships":{"field_contenuto":[{"__typename":"node__normativa","title":"Ocdpc n. 1.081 del 16 marzo 2024","field_titolo_esteso":"Ocdpc n. 1.081 del 16 marzo 2024 - Procedure semplificate relative allo svolgimento dell’analisi della vulnerabilità sismica dell'edilizia privata, di cui all’articolo 2, comma 1, lettera b) del decreto-legge 12 ottobre 2023, n. 140, convertito, con modificazioni, dalla legge 7 dicembre 2023, n. 183, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”.","body":{"processed":"IL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\nVISTO il decreto legislativo 2 gennaio 2018, n. 1 recante “Codice della protezione civile”;
\nVISTO il decreto del Ministero delle infrastrutture e trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;
\nVISTA la direttiva del Presidente del Consiglio dei ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile»;
\nVISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;
\nVISTA la direttiva del Presidente del Consiglio dei ministri 9 novembre 2012 recante “Indirizzi operativi per assicurare l’unitaria partecipazione delle Organizzazioni di Volontariato alle attività di protezione civile”;
\nVISTO il decreto del Presidente del Consiglio dei ministri 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;
\nVISTE le Indicazioni operative del Dipartimento della protezione civile prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle Organizzazioni di Volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\nVISTE le Indicazioni operative del Dipartimento della protezione civile prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\nVISTO il decreto del Presidente del Consiglio dei Ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza;
\nVISTA la direttiva del Presidente del Consiglio dei ministri 14 gennaio del 2014, recante “Programma nazionale di soccorso per il rischio sismico”;
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1”;
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023”;
\nVISTO il decreto-legge 12 ottobre 2023, n. 140, convertito, con modificazioni, dalla legge 7 dicembre 2023, n. 183, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;
\nVISTO l’articolo 2 del citato decreto-legge n. 140/2023 che, nel prevedere la predisposizione e attuazione di un piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico - da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della Regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile - dispone che lo stesso sia composto da: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione. Nel piano sono altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;
\nVISTO il piano straordinario di analisi della vulnerabilità delle zone direttamente interessate dal fenomeno bradisismico, approvato il 26 febbraio 2024, con decreto del Ministro per la protezione civile e le Politiche del mare, di concerto con il Ministro dell’economia e delle finanze;
\nVISTO l’articolo 2, comma 3, del citato decreto-legge n. 140 del 2023 che prevede che, all'interno della zona di intervento il piano straordinario sia realizzato, con riferimento alle attività di cui al comma 1, lettera b), mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea, nel limite massimo di 3,5 milioni di euro per l'anno 2023;
\nCONSIDERATO che, con riferimento alle attività di cui all’articolo 2, comma 1, lettera b) – analisi di vulnerabilità dell’edilizia privata – del decreto-legge n.140 del 2023, il suddetto piano straordinario ha previsto al paragrafo 3.5, lettera a), che l’importo pari a 1.835.000,00 euro, assegnato al Dipartimento della protezione civile, sia da questo utilizzato per i rimborsi relativi ai tecnici rilevatori e per la stipula di specifici accordi con ordini e collegi professionali e/o con strutture di coordinamento tra i medesimi secondo le procedure semplificate che saranno riportate nell’ordinanza prevista ai sensi dell’articolo 2 comma 3 lettera b) del decreto-legge 140 del 2023, e ulteriori oneri connessi alle attività della presente misura;
\nCONSIDERATO che il Dipartimento della protezione civile dispone di strumenti schedografici di analisi già consolidati e condivisi con la comunità scientifica, sviluppati nell’ambito degli accordi del medesimo Dipartimento con i Centri di competenza che operano nell’ambito del rischio sismico e vulcanico;
\nCONSIDERATO che il Dipartimento della protezione civile dispone altresì di consolidati modelli organizzativi e di procedure tecniche per la valutazione, la rilevazione e la classificazione degli effetti degli eventi sulle opere e sulle infrastrutture pubbliche e private, dei danni subiti dalle attività economiche e produttive, dai beni culturali e dal patrimonio edilizio e che tali modelli organizzativi e procedure ben si adattano alla campagna di sopralluoghi tecnici necessari per dare attuazione all’articolo 2 del decreto-legge n. 140 del 2023, per quanto attiene all’analisi di vulnerabilità sismica dell’edilizia privata;
\nATTESA la necessità di procedere con urgenza all’attività di valutazione della vulnerabilità speditiva del patrimonio edilizio privato ordinario, prevalentemente destinato ad abitazione e/o a servizi, che consenta, rispetto ad un piano di verifiche condotto ai sensi delle Norme Tecniche delle Costruzioni 2018, di ottimizzare i tempi e le risorse economiche necessarie per consentire la celere individuazione di idonee misure di mitigazione sul costruito e la stima del relativo fabbisogno finanziario di cui al citato articolo 2, comma 1, lettera b) del decreto legge n. 140 del 2023;
\nTENUTO CONTO che gli strumenti schedografici PLINIVS, CARTIS e CARTIS-edificio, messi a punto, rispettivamente, nell’ambito delle convenzioni con il Dipartimento della protezione civile dal Centro studi per l’ingegneria idrogeologica vulcanica e sismica del centro interdipartimentale di ricerca - laboratorio di urbanistica e pianificazione territoriale - dell’Università Federico II di Napoli (PLINIVS-LUPT) e dalla Rete dei laboratori universitari di ingegneria sismica e strutturale (Consorzio Interuniversitario ReLUIS), così come i criteri e le modalità proposti per il loro impiego, sono stati ritenuti adeguati dal Settore Rischio Sismico della Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta del 2 novembre 2023, al fine di dare attuazione all’articolo 2 del decreto-legge n. 140 del 2023, per quanto attiene l’analisi di vulnerabilità sismica dell’edilizia privata;
\nTENUTO CONTO che il Dipartimento della protezione civile, ai fini di dare attuazione all’articolo 2, comma 2 del decreto-legge n. 140 del 2023, ha proceduto ad una prima delimitazione della zona di intervento relativa all’attuazione del piano di cui all’articolo 2 del medesimo decreto e che quest’ultima è stata approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;
\nATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città Metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;
\nCONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (In particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge n. 140 del 2023;
\nD’INTESA con la Regione Campania;
\n\n
DISPONE
\nART. 1
(Attività di sopralluogo e utilizzo schede di analisi di vulnerabilità sismica dell’edilizia privata e zona di intervento)
\n
ART. 2
(Tecnici rilevatori coinvolti nei sopralluoghi)
ART. 3
(Coperture assicurative, trattamento economico per tecnici rilevatori e per personale coinvolto nelle attività di coordinamento, impiego del Volontariato organizzato di protezione civile)
\n
ART. 4
(Formazione dei tecnici)
ART. 5
(Risorse finanziarie)
ART. 6
(Norme di rinvio)
\n
La presente ordinanza sarà pubblicata nella Gazzetta Ufficiale della Repubblica Italiana.
\n\n
Roma, 16 marzo 2024
\nIL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
Fabrizio Curcio
IL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\r\n\r\nVISTO il decreto legislativo 2 gennaio 2018, n. 1 recante “Codice della protezione civile”;
\r\n\r\nVISTO il decreto del Ministero delle infrastrutture e trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;
\r\n\r\nVISTA la direttiva del Presidente del Consiglio dei ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile»;
\r\n\r\nVISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;
\r\n\r\nVISTA la direttiva del Presidente del Consiglio dei ministri 9 novembre 2012 recante “Indirizzi operativi per assicurare l’unitaria partecipazione delle Organizzazioni di Volontariato alle attività di protezione civile”;
\r\n\r\nVISTO il decreto del Presidente del Consiglio dei ministri 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;
\r\n\r\nVISTE le Indicazioni operative del Dipartimento della protezione civile prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle Organizzazioni di Volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\r\n\r\nVISTE le Indicazioni operative del Dipartimento della protezione civile prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\r\n\r\nVISTO il decreto del Presidente del Consiglio dei Ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza;
\r\n\r\nVISTA la direttiva del Presidente del Consiglio dei ministri 14 gennaio del 2014, recante “Programma nazionale di soccorso per il rischio sismico”;
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1”;
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023”;
\r\n\r\nVISTO il decreto-legge 12 ottobre 2023, n. 140, convertito, con modificazioni, dalla legge 7 dicembre 2023, n. 183, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;
\r\n\r\nVISTO l’articolo 2 del citato decreto-legge n. 140/2023 che, nel prevedere la predisposizione e attuazione di un piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico - da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della Regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile - dispone che lo stesso sia composto da: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione. Nel piano sono altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;
\r\n\r\nVISTO il piano straordinario di analisi della vulnerabilità delle zone direttamente interessate dal fenomeno bradisismico, approvato il 26 febbraio 2024, con decreto del Ministro per la protezione civile e le Politiche del mare, di concerto con il Ministro dell’economia e delle finanze;
\r\n\r\nVISTO l’articolo 2, comma 3, del citato decreto-legge n. 140 del 2023 che prevede che, all'interno della zona di intervento il piano straordinario sia realizzato, con riferimento alle attività di cui al comma 1, lettera b), mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea, nel limite massimo di 3,5 milioni di euro per l'anno 2023;
\r\n\r\nCONSIDERATO che, con riferimento alle attività di cui all’articolo 2, comma 1, lettera b) – analisi di vulnerabilità dell’edilizia privata – del decreto-legge n.140 del 2023, il suddetto piano straordinario ha previsto al paragrafo 3.5, lettera a), che l’importo pari a 1.835.000,00 euro, assegnato al Dipartimento della protezione civile, sia da questo utilizzato per i rimborsi relativi ai tecnici rilevatori e per la stipula di specifici accordi con ordini e collegi professionali e/o con strutture di coordinamento tra i medesimi secondo le procedure semplificate che saranno riportate nell’ordinanza prevista ai sensi dell’articolo 2 comma 3 lettera b) del decreto-legge 140 del 2023, e ulteriori oneri connessi alle attività della presente misura;
\r\n\r\nCONSIDERATO che il Dipartimento della protezione civile dispone di strumenti schedografici di analisi già consolidati e condivisi con la comunità scientifica, sviluppati nell’ambito degli accordi del medesimo Dipartimento con i Centri di competenza che operano nell’ambito del rischio sismico e vulcanico;
\r\n\r\nCONSIDERATO che il Dipartimento della protezione civile dispone altresì di consolidati modelli organizzativi e di procedure tecniche per la valutazione, la rilevazione e la classificazione degli effetti degli eventi sulle opere e sulle infrastrutture pubbliche e private, dei danni subiti dalle attività economiche e produttive, dai beni culturali e dal patrimonio edilizio e che tali modelli organizzativi e procedure ben si adattano alla campagna di sopralluoghi tecnici necessari per dare attuazione all’articolo 2 del decreto-legge n. 140 del 2023, per quanto attiene all’analisi di vulnerabilità sismica dell’edilizia privata;
\r\n\r\nATTESA la necessità di procedere con urgenza all’attività di valutazione della vulnerabilità speditiva del patrimonio edilizio privato ordinario, prevalentemente destinato ad abitazione e/o a servizi, che consenta, rispetto ad un piano di verifiche condotto ai sensi delle Norme Tecniche delle Costruzioni 2018, di ottimizzare i tempi e le risorse economiche necessarie per consentire la celere individuazione di idonee misure di mitigazione sul costruito e la stima del relativo fabbisogno finanziario di cui al citato articolo 2, comma 1, lettera b) del decreto legge n. 140 del 2023;
\r\n\r\nTENUTO CONTO che gli strumenti schedografici PLINIVS, CARTIS e CARTIS-edificio, messi a punto, rispettivamente, nell’ambito delle convenzioni con il Dipartimento della protezione civile dal Centro studi per l’ingegneria idrogeologica vulcanica e sismica del centro interdipartimentale di ricerca - laboratorio di urbanistica e pianificazione territoriale - dell’Università Federico II di Napoli (PLINIVS-LUPT) e dalla Rete dei laboratori universitari di ingegneria sismica e strutturale (Consorzio Interuniversitario ReLUIS), così come i criteri e le modalità proposti per il loro impiego, sono stati ritenuti adeguati dal Settore Rischio Sismico della Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta del 2 novembre 2023, al fine di dare attuazione all’articolo 2 del decreto-legge n. 140 del 2023, per quanto attiene l’analisi di vulnerabilità sismica dell’edilizia privata;
\r\n\r\nTENUTO CONTO che il Dipartimento della protezione civile, ai fini di dare attuazione all’articolo 2, comma 2 del decreto-legge n. 140 del 2023, ha proceduto ad una prima delimitazione della zona di intervento relativa all’attuazione del piano di cui all’articolo 2 del medesimo decreto e che quest’ultima è stata approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;
\r\n\r\nATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città Metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;
\r\n\r\nCONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (In particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge n. 140 del 2023;
\r\n\r\nD’INTESA con la Regione Campania;
\r\n\r\n\r\n\r\n
DISPONE
\r\n\r\nART. 1
\r\n(Attività di sopralluogo e utilizzo schede di analisi di vulnerabilità sismica dell’edilizia privata e zona di intervento)
\r\n\r\n
ART. 2
\r\n(Tecnici rilevatori coinvolti nei sopralluoghi)
ART. 3
\r\n(Coperture assicurative, trattamento economico per tecnici rilevatori e per personale coinvolto nelle attività di coordinamento, impiego del Volontariato organizzato di protezione civile)
\r\n\r\n
ART. 4
\r\n(Formazione dei tecnici)
ART. 5
\r\n(Risorse finanziarie)
ART. 6
\r\n(Norme di rinvio)
\r\n\r\n
La presente ordinanza sarà pubblicata nella Gazzetta Ufficiale della Repubblica Italiana.
\r\n\r\n\r\n\r\n
Roma, 16 marzo 2024
\r\n\r\nIL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\r\nFabrizio Curcio
Pubblicata nella Gazzetta Ufficiale n. 83 del 9 aprile 2024
\n","value":"Pubblicata nella Gazzetta Ufficiale n. 83 del 9 aprile 2024
\r\n"},"field_data":"2024-03-16T15:27:23+01:00","field_categoria_primaria":"normativa","field_codice_lingua":true,"fields":{"slug":"/normativa/ocdpc-n-1081-del-16-marzo-2024-0/"},"field_link":null,"relationships":{"field_sottodominio":{"name":"Portale"},"field_tipo_provvedimento":[{"drupal_internal__tid":466,"name":"Ordinanze","field_etichetta_en":"Ordinances"},{"drupal_internal__tid":467,"name":"Ordinanze del Capo Dipartimento","field_etichetta_en":"Head of Department ordinances"}],"field_immagine_anteprima":null,"field_immagine_dettaglio":null}},{"__typename":"node__normativa","title":"Decreto del Ministro per la Protezione Civile e le Politiche del mare del 26 febbraio 2024 (Approvazione del Piano straordinario fenomeno bradisismico)","field_titolo_esteso":"Decreto del Ministro per la Protezione Civile e le Politiche del mare del 26 febbraio 2024, di concerto con il Ministro dell'Economia e delle Finanze - Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico","body":{"processed":"IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\nDI CONCERTO CON IL MINISTRO DEL’ECONOMIA E DELLE FINANZE
VISTO il decreto legislativo 2 gennaio 2018, n. 1, recante “Codice della protezione civile”;
\nVISTO il decreto del Ministero delle infrastrutture e dei trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;
\nVISTA la direttiva del Presidente del Consiglio dei Ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale, statale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile» e successive modificazioni e integrazioni;
\nVISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;
\nVISTO il decreto-legge 28 aprile 2009 n. 39, convertito, con modificazioni, dalla legge 24 giugno 2009, n. 77 e, in particolare, l’articolo 11, con il quale viene istituito un Fondo per la prevenzione del rischio sismico, nonché le ordinanze di protezione civile di attuazione del medesimo Fondo;
\nVISTO il decreto del Presidente del Consiglio dei ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza e successive modifiche e integrazioni; VISTA la direttiva del Presidente del Consiglio dei ministri del 14 gennaio 2014, recante “Programma nazionale di soccorso per il rischio sismico”;
\nVISTO il Decreto del Presidente del Consiglio 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;
\nVISTE le Indicazioni operative del DPC prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle organizzazioni di volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\nVISTE le Indicazioni operative del DPC prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”.
\nVISTO il decreto del Presidente del Consiglio dei ministri in data 10 novembre 2022, con il quale al Ministro senza portafoglio sen. Nello Musumeci, è stato conferito l’incarico per la protezione civile e le politiche del mare;
\nVISTO il decreto del Presidente del Consiglio dei ministri in data 12 novembre 2022, con il quale sono state delegate al Ministro senza portafoglio sen. Nello Musumeci, le funzioni del Presidente del Consiglio dei ministri ivi indicate, con particolare riferimento all’articolo 2 concernente la delega di funzioni in materia di protezione civile;
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1.”;
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la Protezione civile e le Politiche del mare 8 febbraio 2023.”;
\nVISTO il decreto-legge 12 ottobre 2023, n. 140, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;
\nVISTO l’articolo 2, comma 1 del citato decreto-legge 12 ottobre 2023, n. 140, ai sensi del quale il Dipartimento della protezione civile della Presidenza del Consiglio dei ministri, anche avvalendosi del Consiglio superiore dei lavori pubblici, coordini il concorso della Regione Campania, della Città metropolitana di Napoli, dei comuni interessati e dei centri di competenza di cui all’articolo 21 del Codice di protezione civile; ai fini della la predisposizione e attuazione di un Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile;
\nVISTO il medesimo articolo 2, comma 1 del decreto-legge 12 ottobre 2023, n. 140, che dispone che il citato Piano straordinario sia finalizzato a: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione e che prevede che nel suddetto siano altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;
\nVISTO il medesimo articolo 2, comma 4 del decreto-legge 12 ottobre 2023, n. 140, che per l’attuazione del citato Piano straordinario il Dipartimento della protezione civile si avvalga di una struttura temporanea di supporto;
\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare dell’8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge 12 ottobre 2023, n. 140;
\nTENUTO CONTO della prima delimitazione speditiva della zona di intervento, operata dal Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2 del decreto-legge 12 ottobre 2023, n. 140, approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;
\nATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;
\nCONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (in particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);
\nATTESA la necessità di procedere all’approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nella suddetta area dei Campi Flegrei;
\nATTESA la necessità di non creare disomogeneità di trattamento tra cittadini residenti in immobili ad uso residenziale di proprietà privata e cittadini residenti in immobili ad uso residenziale di proprietà pubblica, e di far rientrare, d’intesa con la Regione Campania, all’interno delle attività di analisi della vulnerabilità sismica dell’edilizia privata di cui all’articolo 2, comma 1, lettera b) del decreto-legge 12 ottobre 2023, n. 140, anche gli edifici residenziali afferenti all’ACER (Agenzia Campana per l’edilizia residenziale);
\nTENUTO CONTO che il Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2, del decreto-legge 12 ottobre 2023, n. 140, primo capoverso, ha acquisito da parte dei soggetti di cui al comma 1 dell’articolo 2, con numero di protocollo dipartimentale 67221 del 28 dicembre 2023, le informazioni ad oggi disponibili sugli edifici di proprietà pubblica censiti all’interno della zona di intervento, in merito agli interventi e alle opere in corso o già attuati, nonché ai finanziamenti a valere sulle risorse pubbliche per tali finalità;
\nTENUTO CONTO che l’articolo 2, comma 3, del citato decreto-legge 12 ottobre 2023, n. 140, con riferimento alle attività di cui al comma 1, lettera b), prevede che il piano straordinario sia realizzato mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea;
\nTENUTO CONTO del contributo fornito dal Consiglio Superiore dei Lavori Pubblici e dai centri di competenza indicati al comma 1 dell’articolo 2 del citato decreto-legge 12 ottobre 2023, n. 140, per la predisposizione del piano di cui trattasi;
\nVISTA la nota della Città metropolitana di Napoli del 2 gennaio 2024, con la quale l’Ente comunica di non avere osservazioni relativamente alla proposta del piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei;
\nVISTA la nota del Comune di Pozzuoli del 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del piano straordinario di cui trattasi;
\nVISTA la comunicazione del Comune di Napoli acquisita dal Dipartimento della protezione civile in data 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del Piano straordinario di cui trattasi
\nVISTE le note del 3 gennaio 2024 con la quale il Capo del Dipartimento della Protezione Civile della Presidenza del Consiglio dei ministri ha trasmesso la proposta di Piano straordinario di cui trattasi alla Regione Campania, ai Comuni di Napoli, Pozzuoli e Bacoli; nonché alla Città metropolitana di Napoli;
\nACQUISITA l’intesa del Presidente della Regione Campania in data 5 gennaio 2024;
\nDI CONCERTO con il Ministro dell’economia e delle finanze;
\nDECRETA
\nART. 1
\n(Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei)
ART. 2
\n(Attuazione del Piano straordinario)
ART. 3
\n(Aspetti finanziari)
Il presente decreto sarà trasmesso agli organi di controllo per la registrazione e sarà pubblicato nella Gazzetta Ufficiale della Repubblica italiana.
\nRoma, 26 febbraio 2024
\nIL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\nNello Musumeci
IL MINISTRO DELL'ECONOMIA E DELLE FINANZE
\nGiancarlo Giorgetti
IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\r\nDI CONCERTO CON IL MINISTRO DEL’ECONOMIA E DELLE FINANZE
VISTO il decreto legislativo 2 gennaio 2018, n. 1, recante “Codice della protezione civile”;
\r\n\r\nVISTO il decreto del Ministero delle infrastrutture e dei trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;
\r\n\r\nVISTA la direttiva del Presidente del Consiglio dei Ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale, statale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile» e successive modificazioni e integrazioni;
\r\n\r\nVISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;
\r\n\r\nVISTO il decreto-legge 28 aprile 2009 n. 39, convertito, con modificazioni, dalla legge 24 giugno 2009, n. 77 e, in particolare, l’articolo 11, con il quale viene istituito un Fondo per la prevenzione del rischio sismico, nonché le ordinanze di protezione civile di attuazione del medesimo Fondo;
\r\n\r\nVISTO il decreto del Presidente del Consiglio dei ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza e successive modifiche e integrazioni; VISTA la direttiva del Presidente del Consiglio dei ministri del 14 gennaio 2014, recante “Programma nazionale di soccorso per il rischio sismico”;
\r\n\r\nVISTO il Decreto del Presidente del Consiglio 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;
\r\n\r\nVISTE le Indicazioni operative del DPC prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle organizzazioni di volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;
\r\n\r\nVISTE le Indicazioni operative del DPC prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”.
\r\n\r\nVISTO il decreto del Presidente del Consiglio dei ministri in data 10 novembre 2022, con il quale al Ministro senza portafoglio sen. Nello Musumeci, è stato conferito l’incarico per la protezione civile e le politiche del mare;
\r\n\r\nVISTO il decreto del Presidente del Consiglio dei ministri in data 12 novembre 2022, con il quale sono state delegate al Ministro senza portafoglio sen. Nello Musumeci, le funzioni del Presidente del Consiglio dei ministri ivi indicate, con particolare riferimento all’articolo 2 concernente la delega di funzioni in materia di protezione civile;
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1.”;
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la Protezione civile e le Politiche del mare 8 febbraio 2023.”;
\r\n\r\nVISTO il decreto-legge 12 ottobre 2023, n. 140, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;
\r\n\r\nVISTO l’articolo 2, comma 1 del citato decreto-legge 12 ottobre 2023, n. 140, ai sensi del quale il Dipartimento della protezione civile della Presidenza del Consiglio dei ministri, anche avvalendosi del Consiglio superiore dei lavori pubblici, coordini il concorso della Regione Campania, della Città metropolitana di Napoli, dei comuni interessati e dei centri di competenza di cui all’articolo 21 del Codice di protezione civile; ai fini della la predisposizione e attuazione di un Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile;
\r\n\r\nVISTO il medesimo articolo 2, comma 1 del decreto-legge 12 ottobre 2023, n. 140, che dispone che il citato Piano straordinario sia finalizzato a: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione e che prevede che nel suddetto siano altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;
\r\n\r\nVISTO il medesimo articolo 2, comma 4 del decreto-legge 12 ottobre 2023, n. 140, che per l’attuazione del citato Piano straordinario il Dipartimento della protezione civile si avvalga di una struttura temporanea di supporto;
\r\n\r\nVISTO il decreto del Ministro per la protezione civile e le politiche del mare dell’8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge 12 ottobre 2023, n. 140;
\r\n\r\nTENUTO CONTO della prima delimitazione speditiva della zona di intervento, operata dal Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2 del decreto-legge 12 ottobre 2023, n. 140, approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;
\r\n\r\nATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;
\r\n\r\nCONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (in particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);
\r\n\r\nATTESA la necessità di procedere all’approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nella suddetta area dei Campi Flegrei;
\r\n\r\nATTESA la necessità di non creare disomogeneità di trattamento tra cittadini residenti in immobili ad uso residenziale di proprietà privata e cittadini residenti in immobili ad uso residenziale di proprietà pubblica, e di far rientrare, d’intesa con la Regione Campania, all’interno delle attività di analisi della vulnerabilità sismica dell’edilizia privata di cui all’articolo 2, comma 1, lettera b) del decreto-legge 12 ottobre 2023, n. 140, anche gli edifici residenziali afferenti all’ACER (Agenzia Campana per l’edilizia residenziale);
\r\n\r\nTENUTO CONTO che il Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2, del decreto-legge 12 ottobre 2023, n. 140, primo capoverso, ha acquisito da parte dei soggetti di cui al comma 1 dell’articolo 2, con numero di protocollo dipartimentale 67221 del 28 dicembre 2023, le informazioni ad oggi disponibili sugli edifici di proprietà pubblica censiti all’interno della zona di intervento, in merito agli interventi e alle opere in corso o già attuati, nonché ai finanziamenti a valere sulle risorse pubbliche per tali finalità;
\r\n\r\nTENUTO CONTO che l’articolo 2, comma 3, del citato decreto-legge 12 ottobre 2023, n. 140, con riferimento alle attività di cui al comma 1, lettera b), prevede che il piano straordinario sia realizzato mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea;
\r\n\r\nTENUTO CONTO del contributo fornito dal Consiglio Superiore dei Lavori Pubblici e dai centri di competenza indicati al comma 1 dell’articolo 2 del citato decreto-legge 12 ottobre 2023, n. 140, per la predisposizione del piano di cui trattasi;
\r\n\r\nVISTA la nota della Città metropolitana di Napoli del 2 gennaio 2024, con la quale l’Ente comunica di non avere osservazioni relativamente alla proposta del piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei;
\r\n\r\nVISTA la nota del Comune di Pozzuoli del 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del piano straordinario di cui trattasi;
\r\n\r\nVISTA la comunicazione del Comune di Napoli acquisita dal Dipartimento della protezione civile in data 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del Piano straordinario di cui trattasi
\r\n\r\nVISTE le note del 3 gennaio 2024 con la quale il Capo del Dipartimento della Protezione Civile della Presidenza del Consiglio dei ministri ha trasmesso la proposta di Piano straordinario di cui trattasi alla Regione Campania, ai Comuni di Napoli, Pozzuoli e Bacoli; nonché alla Città metropolitana di Napoli;
\r\n\r\nACQUISITA l’intesa del Presidente della Regione Campania in data 5 gennaio 2024;
\r\n\r\nDI CONCERTO con il Ministro dell’economia e delle finanze;
\r\n\r\nDECRETA
\r\n\r\nART. 1
\r\n(Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei)
ART. 2
\r\n(Attuazione del Piano straordinario)
ART. 3
\r\n(Aspetti finanziari)
Il presente decreto sarà trasmesso agli organi di controllo per la registrazione e sarà pubblicato nella Gazzetta Ufficiale della Repubblica italiana.
\r\n\r\nRoma, 26 febbraio 2024
\r\n\r\nIL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\r\nNello Musumeci
IL MINISTRO DELL'ECONOMIA E DELLE FINANZE
\r\nGiancarlo Giorgetti
Pubblicato nella Gazzetta Ufficiale n. 90 del 17 aprile 2024
\n","value":"Pubblicato nella Gazzetta Ufficiale n. 90 del 17 aprile 2024
\r\n"},"field_data":"2024-02-26T14:00:26+01:00","field_categoria_primaria":"normativa","field_codice_lingua":true,"fields":{"slug":"/normativa/decreto-del-ministro-la-protezione-civile-e-le-politiche-del-mare-del-26-febbraio-2024-approvazione-del-piano-straordinario-fenomeno-bradisismico-0/"},"field_link":null,"relationships":{"field_sottodominio":{"name":"Portale"},"field_tipo_provvedimento":[{"drupal_internal__tid":444,"name":"Decreti","field_etichetta_en":"Decrees"},{"drupal_internal__tid":2157,"name":"Decreti del Ministro per la Protezione Civile e le Politiche del mare","field_etichetta_en":"Decreti del Ministro per la Protezione Civile e le Politiche del mare"}],"field_immagine_anteprima":null,"field_immagine_dettaglio":null}},{"__typename":"node__normativa","title":"Nota del Capo del Dipartimento del 12 dicembre 2023: DL n.140 2023 - art. 4. Trasmissione del documento di Pianificazione speditiva di emergenza per l'area del bradisismo","field_titolo_esteso":"Nota del Capo del Dipartimento del 12 dicembre 2023: DL n.140/2023 - art. 4. Trasmissione del documento di Pianificazione speditiva di emergenza per l'area del bradisismo","body":{"processed":"In relazione a quanto previsto dall’art. 4 del decreto-legge 12 ottobre 2023, n. 140 recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell’area dei Campi Flegrei”, si trasmette il documento di Pianificazione speditiva di emergenza per l’area del bradisismo elaborato in raccordo con la Regione Campania, con la Prefettura – UTG di Napoli e con gli enti e le amministrazioni territoriali interessate.
\nLa pianificazione in oggetto costituisce il riferimento in cui vengono definite la strategia generale e le principali azioni operative di livello nazionale, regionale e locale finalizzate anche ad un eventuale intervento nazionale sul territorio interessato. I contenuti riportati nel documento rappresentano, quindi, anche un riferimento per l’intervento delle componenti e delle strutture operative del Servizio nazionale della protezione civile.
\nIl carattere speditivo della pianificazione è tale da non rappresentare esaustivamente le esigenze operative che potrebbero occorrere al manifestarsi di un evento emergenziale. Infatti, le procedure riportate nel documento, sono quelle ritenute più rispondenti agli scenari operativi ipotizzati, che prevedono la conseguente risposta all’emergenza che ciascuna componente, richiamata nel documento, attua in funzione delle proprie responsabilità e competenze. Tale risposta potrà variare in relazione ai reali effetti che si manifestano a seguito dei possibili eventi connessi al bradisismo.
\nIl documento non sostituisce le pianificazioni di protezione civile vigenti redatte dai diversi livelli di competenza e responsabilità che dovranno essere aggiornate e integrate, laddove necessario, tenendo conto di quanto previsto nella presente pianificazione per favorire la necessaria integrazione delle attività operative.
\nIL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\nFabrizio Curcio
In relazione a quanto previsto dall’art. 4 del decreto-legge 12 ottobre 2023, n. 140 recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell’area dei Campi Flegrei”, si trasmette il documento di Pianificazione speditiva di emergenza per l’area del bradisismo elaborato in raccordo con la Regione Campania, con la Prefettura – UTG di Napoli e con gli enti e le amministrazioni territoriali interessate.
\r\n\r\nLa pianificazione in oggetto costituisce il riferimento in cui vengono definite la strategia generale e le principali azioni operative di livello nazionale, regionale e locale finalizzate anche ad un eventuale intervento nazionale sul territorio interessato. I contenuti riportati nel documento rappresentano, quindi, anche un riferimento per l’intervento delle componenti e delle strutture operative del Servizio nazionale della protezione civile.
\r\n\r\nIl carattere speditivo della pianificazione è tale da non rappresentare esaustivamente le esigenze operative che potrebbero occorrere al manifestarsi di un evento emergenziale. Infatti, le procedure riportate nel documento, sono quelle ritenute più rispondenti agli scenari operativi ipotizzati, che prevedono la conseguente risposta all’emergenza che ciascuna componente, richiamata nel documento, attua in funzione delle proprie responsabilità e competenze. Tale risposta potrà variare in relazione ai reali effetti che si manifestano a seguito dei possibili eventi connessi al bradisismo.
\r\n\r\nIl documento non sostituisce le pianificazioni di protezione civile vigenti redatte dai diversi livelli di competenza e responsabilità che dovranno essere aggiornate e integrate, laddove necessario, tenendo conto di quanto previsto nella presente pianificazione per favorire la necessaria integrazione delle attività operative.
\r\n\r\nIL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\r\nFabrizio Curcio