{"componentChunkName":"component---src-templates-pagina-foglia-completa-template-en-jsx","path":"/en/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/","result":{"data":{"node":{"title":"The response of the National Service","field_titolo_esteso":"The response of the National Service","drupal_internal__nid":900011442,"field_data":"2023-12-20T14:37:21+01:00","field_id_contenuto_originale":900011441,"field_categoria_primaria":"pagina","field_streaming_homepage":false,"field_link":null,"body":{"processed":"

To provide an organic response to the ongoing bradyseismic crisis, with structural and nonstructural prevention measures, the government approved Decree-Law No. 140 of October 12, 2023, \"Urgent measures for the prevention of seismic risk related to the bradyseism phenomenon in the Phlegraean Fields area,\" which was later converted into Law No. 183 of December 7, 2023.

\n

Decree-Law No. 140 of October 12, 2023. The measure outlines the main actions the Civil Protection System must implement to effectively respond to a complex risk situation such as the one of the Phlegraean Fields area. The analysis of the vulnerability of the built-up areas, the elaboration of an emergency plan dedicated to bradyseism, the definition of a communication plan to the population, and the assessment of the functioning of the transport infrastructure and other essential services are the major lines of activity in which the Civil Protection Department, the Campania Region and the Centers of Expertise with the most technical preparation and experience in this field in our country, namely the INGV-OV, the PLINIVS Study Centre, the Reluis Interuniversity Consortium, Eucentre, CNR-IREA, and CNR-IGAG, are engaged, working closely with the affected municipalities and the metropolitan city of Naples. In addition, the decree-law includes strengthening the territorial civil protection operational response.

\n

The vulnerability analysis plan for built-up areasBy the Decree of the Minister for Civil Protection and Sea Policies of February 26, 2024, in agreement with the Minister of Economy and Finance, a Rapid Emergency Plan, coordinated by the Department, was finally approved for analyzing the seismic vulnerability of the building heritage and local hazards in built-up areas through a new seismic microzonation study. The activities under this Plan apply to the intervention area, which was identified as part of the Rapid Emergency Planning for the area affected by bradyseism.

\n

These efforts are intended to support seismic redevelopment strategies and identify intervention priorities on private and public assets. A program to strengthen seismic and structure monitoring is also planned through integrating networks managed by the Ingv Vesuvius Observatory and the Civil Protection Department.

\n

The communication plan. As one of the urgent measures, the decree-law foresees the implementation of a Communication Plan to the population, coordinated by the Campania Region, to disseminate knowledge of risks, civil protection planning, and the correct behaviors to be adopted in the affected areas, focusing on people with disabilities.

\n

More specifically, the Plan is structured into macro-activities involving the implementation of awareness and service communication campaigns; the enhancement and standardization of institutional websites; the development of a regional app for citizens; the arrangement of regular meetings with the population and events targeting schools and universities in the areas affected by the phenomenon of bradyseism; the scheduling of cultural events and promoted by the third sector; the support of the information desks of the affected municipalities; the planning of open days of public facilities; the realization of training activities aimed at journalists, volunteers, school leaders, managers, officials and civil servants, including those of the affected municipalities; and the design, production and installation of multilingual street signs. 

\n

The Plan was approved by Resolution No. 679 by the Regional Council of the Campania Region on November 23, 2023. It was published in the Official Bulletin of the Campania Region No. 86 on December 04, 2023.

\n

The Rapid Emergency Planning for bradyseism. Provided for in Article 4 of Decree-Law 140, this planning originates from the urgent need to define a specific strategy and operational procedures in response to the effects and possible consequences of bradyseism.

\n

It is drafted by the Civil Protection Department, in cooperation with the Campania Region, the Prefecture - UTG of Naples, and the relevant authorities and territorial administrations, according to the local and national civil protection plans and the risk knowledge elaborated by the Centers of Expertise.

\n

The assessment of transportation infrastructure and essential services. The Campania Region is also coordinating activities with the affected municipalities to assess and identify critical issues that need to be overcome to ensure the functionality of transportation infrastructure and other essential services and to support the updating of planning for bradyseism. By Resolution No. 7 of the Regional Council dated January 10, 2024, the \" Urgent measures to verify the functionality of transportation infrastructure and other essential services\" were approved.

\n

 

\n"},"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/"},"field_link_esterni":[{"title":"Map of Rapid Emergency Planning in the Phlegraean Fields","uri":"https://mappe.protezionecivile.gov.it/en/risks-maps-and-dashboards/rapid-emergency-planning-phlegraean-fields/"}],"field_tabella":null,"relationships":{"field_sottodominio":{"name":"Rischi"},"field_riferimento_traduzione":{"fields":{"slug":"/vulcanico/vulcani-italia/campi-flegrei/il-bradisismo-ai-campi-flegrei/la-risposta-del-servizio-nazionale/"}},"field_immagine_singola":null,"field_mappa":null,"field_box_social":null,"field_accordion":[],"field_tab":[],"field_immagine_dettaglio":{"field_alt":"Risposta del Servizio Nazionale","field_didascalia":"Risposta del Servizio Nazionale","relationships":{"image":{"localFile":{"publicURL":"/static/0fdcb480d5b17ab790bb617933ba4022/response-eng.svg","childImageSharp":null}}}},"field_immagine_anteprima":null,"field_galleria_flickr":null,"field_galleria_foto":null,"field_video_content":null,"field_allegati":[{"title":"Piano di comunicazione alla popolazione - D.L.12 Ottobre 2023, n.140","field_titolo_esteso":"Piano di comunicazione alla popolazione - D.L.12 Ottobre 2023, n.140","relationships":{"field_allegato":{"filesize":2425508,"localFile":{"publicURL":"/static/60284f664cdaddfece08fedf083a99e5/piano-comunicazione-allegati.pdf","extension":"pdf"},"filename":"piano-comunicazione-allegati.pdf"}}}],"field_correlazioni":[],"field_normative":[{"title":"Decreto del Ministro per la Protezione Civile e le Politiche del mare del 26 febbraio 2024 (Approvazione del Piano straordinario fenomeno bradisismico)","field_titolo_esteso":"Decreto del Ministro per la Protezione Civile e le Politiche del mare del 26 febbraio 2024, di concerto con il Ministro dell'Economia e delle Finanze - Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico","body":{"processed":"

IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\nDI CONCERTO CON IL MINISTRO DEL’ECONOMIA E DELLE FINANZE

\n

VISTO il decreto legislativo 2 gennaio 2018, n. 1, recante “Codice della protezione civile”;

\n

VISTO il decreto del Ministero delle infrastrutture e dei trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;

\n

VISTA la direttiva del Presidente del Consiglio dei Ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale, statale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile» e successive modificazioni e integrazioni;

\n

VISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;

\n

VISTO il decreto-legge 28 aprile 2009 n. 39, convertito, con modificazioni, dalla legge 24 giugno 2009, n. 77 e, in particolare, l’articolo 11, con il quale viene istituito un Fondo per la prevenzione del rischio sismico, nonché le ordinanze di protezione civile di attuazione del medesimo Fondo;

\n

VISTO il decreto del Presidente del Consiglio dei ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza e successive modifiche e integrazioni; VISTA la direttiva del Presidente del Consiglio dei ministri del 14 gennaio 2014, recante “Programma nazionale di soccorso per il rischio sismico”;

\n

VISTO il Decreto del Presidente del Consiglio 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;

\n

VISTE le Indicazioni operative del DPC prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle organizzazioni di volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;

\n

VISTE le Indicazioni operative del DPC prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”.

\n

VISTO il decreto del Presidente del Consiglio dei ministri in data 10 novembre 2022, con il quale al Ministro senza portafoglio sen. Nello Musumeci, è stato conferito l’incarico per la protezione civile e le politiche del mare;

\n

VISTO il decreto del Presidente del Consiglio dei ministri in data 12 novembre 2022, con il quale sono state delegate al Ministro senza portafoglio sen. Nello Musumeci, le funzioni del Presidente del Consiglio dei ministri ivi indicate, con particolare riferimento all’articolo 2 concernente la delega di funzioni in materia di protezione civile;

\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1.”;

\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la Protezione civile e le Politiche del mare 8 febbraio 2023.”;

\n

VISTO il decreto-legge 12 ottobre 2023, n. 140, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;

\n

VISTO l’articolo 2, comma 1 del citato decreto-legge 12 ottobre 2023, n. 140, ai sensi del quale il Dipartimento della protezione civile della Presidenza del Consiglio dei ministri, anche avvalendosi del Consiglio superiore dei lavori pubblici, coordini il concorso della Regione Campania, della Città metropolitana di Napoli, dei comuni interessati e dei centri di competenza di cui all’articolo 21 del Codice di protezione civile; ai fini della la predisposizione e attuazione di un Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile;

\n

VISTO il medesimo articolo 2, comma 1 del decreto-legge 12 ottobre 2023, n. 140, che dispone che il citato Piano straordinario sia finalizzato a: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione e che prevede che nel suddetto siano altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;

\n

VISTO il medesimo articolo 2, comma 4 del decreto-legge 12 ottobre 2023, n. 140, che per l’attuazione del citato Piano straordinario il Dipartimento della protezione civile si avvalga di una struttura temporanea di supporto;

\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare dell’8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge 12 ottobre 2023, n. 140;

\n

TENUTO CONTO della prima delimitazione speditiva della zona di intervento, operata dal Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2 del decreto-legge 12 ottobre 2023, n. 140, approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;

\n

ATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;

\n

CONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (in particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);

\n

ATTESA la necessità di procedere all’approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nella suddetta area dei Campi Flegrei;

\n

ATTESA la necessità di non creare disomogeneità di trattamento tra cittadini residenti in immobili ad uso residenziale di proprietà privata e cittadini residenti in immobili ad uso residenziale di proprietà pubblica, e di far rientrare, d’intesa con la Regione Campania, all’interno delle attività di analisi della vulnerabilità sismica dell’edilizia privata di cui all’articolo 2, comma 1, lettera b) del decreto-legge 12 ottobre 2023, n. 140, anche gli edifici residenziali afferenti all’ACER (Agenzia Campana per l’edilizia residenziale);

\n

TENUTO CONTO che il Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2, del decreto-legge 12 ottobre 2023, n. 140, primo capoverso, ha acquisito da parte dei soggetti di cui al comma 1 dell’articolo 2, con numero di protocollo dipartimentale 67221 del 28 dicembre 2023, le informazioni ad oggi disponibili sugli edifici di proprietà pubblica censiti all’interno della zona di intervento, in merito agli interventi e alle opere in corso o già attuati, nonché ai finanziamenti a valere sulle risorse pubbliche per tali finalità;

\n

TENUTO CONTO che l’articolo 2, comma 3, del citato decreto-legge 12 ottobre 2023, n. 140, con riferimento alle attività di cui al comma 1, lettera b), prevede che il piano straordinario sia realizzato mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea;

\n

TENUTO CONTO del contributo fornito dal Consiglio Superiore dei Lavori Pubblici e dai centri di competenza indicati al comma 1 dell’articolo 2 del citato decreto-legge 12 ottobre 2023, n. 140, per la predisposizione del piano di cui trattasi;

\n

VISTA la nota della Città metropolitana di Napoli del 2 gennaio 2024, con la quale l’Ente comunica di non avere osservazioni relativamente alla proposta del piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei;

\n

VISTA la nota del Comune di Pozzuoli del 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del piano straordinario di cui trattasi;

\n

VISTA la comunicazione del Comune di Napoli acquisita dal Dipartimento della protezione civile in data 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del Piano straordinario di cui trattasi

\n

VISTE le note del 3 gennaio 2024 con la quale il Capo del Dipartimento della Protezione Civile della Presidenza del Consiglio dei ministri ha trasmesso la proposta di Piano straordinario di cui trattasi alla Regione Campania, ai Comuni di Napoli, Pozzuoli e Bacoli; nonché alla Città metropolitana di Napoli;

\n

ACQUISITA l’intesa del Presidente della Regione Campania in data 5 gennaio 2024;

\n

DI CONCERTO con il Ministro dell’economia e delle finanze;

\n

DECRETA

\n

ART. 1
\n(Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei)

\n
  1.  Ai sensi dell'articolo 2, comma 1, del decreto-legge 12 ottobre 2023, n. 140, convertito, con modificazioni, dalla legge 7 dicembre 2023, n.183, è approvato il Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei riportato nell’allegato 1 che forma parte integrante del presente decreto.
  2. \n

ART. 2
\n(Attuazione del Piano straordinario)

\n
  1. All’attuazione del Piano straordinario in allegato 1 al presente decreto provvede il Dipartimento della protezione civile della Presidenza del Consiglio dei Ministri che, anche avvalendosi del Consiglio Superiore dei Lavori Pubblici, coordina il concorso della Regione Campania, della Città Metropolitana di Napoli, dei Comuni di Napoli, Pozzuoli e Bacoli, dei centri di competenza individuati dall’articolo2, comma 1, del decreto-legge 12 ottobre 2023, n. 140, e degli altri soggetti responsabili delle linee di attività specificati nel Piano medesimo.
  2. \n

ART. 3
\n(Aspetti finanziari)

\n
  1.  All’attuazione del presente Piano si provvede nei limiti delle risorse previste allo scopo a legislazione vigente, ivi incluse quelle di cui all’articolo 2 del decreto legge n.140/2023, convertito in legge n. 183/2023.
  2. \n
  3. Ferme restando e nei limiti delle assegnazioni massime dettate per le singole finalità di cui all’articolo 2, comma 3, del citato decreto-legge n. 140/2023, il Dipartimento della protezione civile è autorizzato a rimodulare le somme destinate alle specifiche misure di dettaglio individuate nel Piano sulla base delle effettive necessità.
  4. \n

Il presente decreto sarà trasmesso agli organi di controllo per la registrazione e sarà pubblicato nella Gazzetta Ufficiale della Repubblica italiana.

\n

Roma, 26 febbraio 2024

\n

IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\nNello Musumeci

\n

IL MINISTRO DELL'ECONOMIA E DELLE FINANZE
\nGiancarlo Giorgetti

\n","value":"

IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\r\nDI CONCERTO CON IL MINISTRO DEL’ECONOMIA E DELLE FINANZE

\r\n\r\n

VISTO il decreto legislativo 2 gennaio 2018, n. 1, recante “Codice della protezione civile”;

\r\n\r\n

VISTO il decreto del Ministero delle infrastrutture e dei trasporti, 17 gennaio 2018 emanato di concerto con il Ministro dell’interno e con il Capo del Dipartimento della protezione civile, con il quale è stato aggiornato il testo delle norme tecniche per le costruzioni;

\r\n\r\n

VISTA la direttiva del Presidente del Consiglio dei Ministri 27 febbraio 2004 recante «Indirizzi operativi per la gestione organizzativa e funzionale del sistema di allertamento nazionale, statale e regionale per il rischio idrogeologico e idraulico ai fini di protezione civile» e successive modificazioni e integrazioni;

\r\n\r\n

VISTO, in particolare, il punto 3 della suddetta direttiva, che stabilisce i compiti, le funzioni e l'organizzazione della rete dei Centri funzionali per le finalità di protezione civile e dei Centri di competenza;

\r\n\r\n

VISTO il decreto-legge 28 aprile 2009 n. 39, convertito, con modificazioni, dalla legge 24 giugno 2009, n. 77 e, in particolare, l’articolo 11, con il quale viene istituito un Fondo per la prevenzione del rischio sismico, nonché le ordinanze di protezione civile di attuazione del medesimo Fondo;

\r\n\r\n

VISTO il decreto del Presidente del Consiglio dei ministri 14 settembre 2012, recante la definizione dei principi per l’individuazione e il funzionamento dei Centri di competenza e successive modifiche e integrazioni; VISTA la direttiva del Presidente del Consiglio dei ministri del 14 gennaio 2014, recante “Programma nazionale di soccorso per il rischio sismico”;

\r\n\r\n

VISTO il Decreto del Presidente del Consiglio 8 luglio 2014 recante “Istituzione del Nucleo Tecnico Nazionale (NTN) per il rilievo del danno e la valutazione di agibilità nell'emergenza post-sismica e approvazione dell'aggiornamento del modello per il rilevamento dei danni, pronto intervento e agibilità per edifici ordinari nell'emergenza post-sismica e del relativo manuale di compilazione”;

\r\n\r\n

VISTE le Indicazioni operative del DPC prot. 57046 del 29 ottobre 2020, per la formazione dei tecnici della pubblica amministrazione, delle organizzazioni di volontariato e professionisti iscritti agli albi di ordini e collegi, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”;

\r\n\r\n

VISTE le Indicazioni operative del DPC prot. 7761 del 12 febbraio 2021, per il raccordo e il coordinamento delle attività di sopralluogo tecnico, nell’ambito della “Valutazione dell’impatto, censimento dei danni e rilievo dell’agibilità post-sisma sulle strutture pubbliche e private e sugli edifici di interesse culturale”.

\r\n\r\n

VISTO il decreto del Presidente del Consiglio dei ministri in data 10 novembre 2022, con il quale al Ministro senza portafoglio sen. Nello Musumeci, è stato conferito l’incarico per la protezione civile e le politiche del mare;

\r\n\r\n

VISTO il decreto del Presidente del Consiglio dei ministri in data 12 novembre 2022, con il quale sono state delegate al Ministro senza portafoglio sen. Nello Musumeci, le funzioni del Presidente del Consiglio dei ministri ivi indicate, con particolare riferimento all’articolo 2 concernente la delega di funzioni in materia di protezione civile;

\r\n\r\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare 8 febbraio 2023 recante “Composizione e modalità di funzionamento della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1.”;

\r\n\r\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare 31 agosto 2023 recante “Nomina dei componenti della Commissione nazionale per la previsione e la prevenzione dei grandi rischi di cui all'articolo 20 del decreto legislativo 2 gennaio 2018, n. 1, in attuazione dell’articolo 2, comma 5 del decreto del Ministro per la Protezione civile e le Politiche del mare 8 febbraio 2023.”;

\r\n\r\n

VISTO il decreto-legge 12 ottobre 2023, n. 140, recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell'area dei Campi Flegrei”, che prevede misure urgenti per fronteggiare, anche mediante il ricorso a procedure semplificate e altre disposizioni di accelerazione, gli effetti dell'evoluzione del fenomeno bradisismico, in atto nell'area dei Campi Flegrei, nel territorio di alcuni comuni o parti di comuni della Città metropolitana di Napoli;

\r\n\r\n

VISTO l’articolo 2, comma 1 del citato decreto-legge 12 ottobre 2023, n. 140, ai sensi del quale il Dipartimento della protezione civile della Presidenza del Consiglio dei ministri, anche avvalendosi del Consiglio superiore dei lavori pubblici, coordini il concorso della Regione Campania, della Città metropolitana di Napoli, dei comuni interessati e dei centri di competenza di cui all’articolo 21 del Codice di protezione civile; ai fini della la predisposizione e attuazione di un Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei da approvarsi con decreto del Ministro per la protezione civile e le politiche del mare, di concerto con il Ministro dell'economia e delle finanze, d'intesa con il Presidente della regione Campania e sentiti la Città metropolitana di Napoli e i Sindaci dei comuni interessati, sulla base di una proposta tecnica formulata dal Dipartimento della protezione civile;

\r\n\r\n

VISTO il medesimo articolo 2, comma 1 del decreto-legge 12 ottobre 2023, n. 140, che dispone che il citato Piano straordinario sia finalizzato a: a) uno studio di microzonazione sismica; b) un'analisi della vulnerabilità sismica dell'edilizia privata, finalizzata all'individuazione di idonee misure di mitigazione e alla stima del relativo fabbisogno finanziario; c) un'analisi della vulnerabilità sismica dell'edilizia pubblica e, all'esito, un primo piano di misure per la relativa mitigazione, con apposito cronoprogramma, per la cui esecuzione possono essere attivati accordi con i competenti ordini professionali al fine di assicurare tempi certi, omogeneità e celerità dell'attuazione e che prevede che nel suddetto siano altresì disciplinate le modalità di monitoraggio e di revoca in caso di mancato rispetto dei relativi cronoprogrammi; d) un programma di implementazione del monitoraggio sismico e delle strutture;

\r\n\r\n

VISTO il medesimo articolo 2, comma 4 del decreto-legge 12 ottobre 2023, n. 140, che per l’attuazione del citato Piano straordinario il Dipartimento della protezione civile si avvalga di una struttura temporanea di supporto;

\r\n\r\n

VISTO il decreto del Ministro per la protezione civile e le politiche del mare dell’8 novembre 2023 istitutivo della Struttura temporanea di supporto al Dipartimento della protezione civile ai sensi dell’articolo 2, comma 4, del decreto-legge 12 ottobre 2023, n. 140;

\r\n\r\n

TENUTO CONTO della prima delimitazione speditiva della zona di intervento, operata dal Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2 del decreto-legge 12 ottobre 2023, n. 140, approvata dalla Commissione Grandi Rischi di cui all’articolo 20 del decreto legislativo n. 1 del 2018, nella seduta congiunta dei settori Sismico e Vulcanico del 3 novembre 2023;

\r\n\r\n

ATTESO che la perimetrazione di tale area di intervento, basata su parametri fisici e scientifici, è stata successivamente ridefinita e regolarizzata, anche in base ai confini amministrativi, da parte dei medesimi Comuni interessati e della Città metropolitana di Napoli, in raccordo con la Regione Campania e il Dipartimento della protezione civile ed è stata trasmessa dalla citata Città metropolitana con nota acquisita al protocollo dipartimentale al n. 66862 del 27 dicembre 2023;

\r\n\r\n

CONSIDERATO che la suddetta area include parte dei Comuni di Pozzuoli, Bacoli e Napoli (in particolare, con riferimento al Comune di Napoli, il Quartiere di Bagnoli all’interno della municipalità di Fuorigrotta-Bagnoli e porzione delle municipalità di Soccavo/Pianura e di Posillipo);

\r\n\r\n

ATTESA la necessità di procedere all’approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nella suddetta area dei Campi Flegrei;

\r\n\r\n

ATTESA la necessità di non creare disomogeneità di trattamento tra cittadini residenti in immobili ad uso residenziale di proprietà privata e cittadini residenti in immobili ad uso residenziale di proprietà pubblica, e di far rientrare, d’intesa con la Regione Campania, all’interno delle attività di analisi della vulnerabilità sismica dell’edilizia privata di cui all’articolo 2, comma 1, lettera b) del decreto-legge 12 ottobre 2023, n. 140, anche gli edifici residenziali afferenti all’ACER (Agenzia Campana per l’edilizia residenziale);

\r\n\r\n

TENUTO CONTO che il Dipartimento della protezione civile, ai sensi dell’articolo 2, comma 2, del decreto-legge 12 ottobre 2023, n. 140, primo capoverso, ha acquisito da parte dei soggetti di cui al comma 1 dell’articolo 2, con numero di protocollo dipartimentale 67221 del 28 dicembre 2023, le informazioni ad oggi disponibili sugli edifici di proprietà pubblica censiti all’interno della zona di intervento, in merito agli interventi e alle opere in corso o già attuati, nonché ai finanziamenti a valere sulle risorse pubbliche per tali finalità;

\r\n\r\n

TENUTO CONTO che l’articolo 2, comma 3, del citato decreto-legge 12 ottobre 2023, n. 140, con riferimento alle attività di cui al comma 1, lettera b), prevede che il piano straordinario sia realizzato mediante procedure semplificate che non hanno il valore di verifica sismica ai sensi delle Norme tecniche per le costruzioni di cui al decreto del Ministro delle infrastrutture e dei trasporti del 17 gennaio 2018, individuate dal Capo del Dipartimento della protezione civile, con apposita ordinanza, d’intesa con la Regione Campania, con efficacia dalla data di adozione, in deroga ad ogni disposizione vigente e nel rispetto dei principi generali dell'ordinamento giuridico e delle norme dell'Unione europea;

\r\n\r\n

TENUTO CONTO del contributo fornito dal Consiglio Superiore dei Lavori Pubblici e dai centri di competenza indicati al comma 1 dell’articolo 2 del citato decreto-legge 12 ottobre 2023, n. 140, per la predisposizione del piano di cui trattasi;

\r\n\r\n

VISTA la nota della Città metropolitana di Napoli del 2 gennaio 2024, con la quale l’Ente comunica di non avere osservazioni relativamente alla proposta del piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei;

\r\n\r\n

VISTA la nota del Comune di Pozzuoli del 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del piano straordinario di cui trattasi;

\r\n\r\n

VISTA la comunicazione del Comune di Napoli acquisita dal Dipartimento della protezione civile in data 2 gennaio 2024, con la quale sono state trasmesse le osservazioni relativamente alla proposta del Piano straordinario di cui trattasi

\r\n\r\n

VISTE le note del 3 gennaio 2024 con la quale il Capo del Dipartimento della Protezione Civile della Presidenza del Consiglio dei ministri ha trasmesso la proposta di Piano straordinario di cui trattasi alla Regione Campania, ai Comuni di Napoli, Pozzuoli e Bacoli; nonché alla Città metropolitana di Napoli;

\r\n\r\n

ACQUISITA l’intesa del Presidente della Regione Campania in data 5 gennaio 2024;

\r\n\r\n

DI CONCERTO con il Ministro dell’economia e delle finanze;

\r\n\r\n

DECRETA

\r\n\r\n

ART. 1
\r\n(Approvazione del Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei)

\r\n\r\n
    \r\n\t
  1.  Ai sensi dell'articolo 2, comma 1, del decreto-legge 12 ottobre 2023, n. 140, convertito, con modificazioni, dalla legge 7 dicembre 2023, n.183, è approvato il Piano straordinario di analisi della vulnerabilità delle zone edificate direttamente interessate dal fenomeno bradisismico nell’area dei Campi Flegrei riportato nell’allegato 1 che forma parte integrante del presente decreto.
  2. \r\n
\r\n\r\n

ART. 2
\r\n(Attuazione del Piano straordinario)

\r\n\r\n
    \r\n\t
  1. All’attuazione del Piano straordinario in allegato 1 al presente decreto provvede il Dipartimento della protezione civile della Presidenza del Consiglio dei Ministri che, anche avvalendosi del Consiglio Superiore dei Lavori Pubblici, coordina il concorso della Regione Campania, della Città Metropolitana di Napoli, dei Comuni di Napoli, Pozzuoli e Bacoli, dei centri di competenza individuati dall’articolo2, comma 1, del decreto-legge 12 ottobre 2023, n. 140, e degli altri soggetti responsabili delle linee di attività specificati nel Piano medesimo.
  2. \r\n
\r\n\r\n

ART. 3
\r\n(Aspetti finanziari)

\r\n\r\n
    \r\n\t
  1.  All’attuazione del presente Piano si provvede nei limiti delle risorse previste allo scopo a legislazione vigente, ivi incluse quelle di cui all’articolo 2 del decreto legge n.140/2023, convertito in legge n. 183/2023.
  2. \r\n\t
  3. Ferme restando e nei limiti delle assegnazioni massime dettate per le singole finalità di cui all’articolo 2, comma 3, del citato decreto-legge n. 140/2023, il Dipartimento della protezione civile è autorizzato a rimodulare le somme destinate alle specifiche misure di dettaglio individuate nel Piano sulla base delle effettive necessità.
  4. \r\n
\r\n\r\n

Il presente decreto sarà trasmesso agli organi di controllo per la registrazione e sarà pubblicato nella Gazzetta Ufficiale della Repubblica italiana.

\r\n\r\n

Roma, 26 febbraio 2024

\r\n\r\n

IL MINISTRO PER LA PROTEZIONE CIVILE E LE POLITICHE DEL MARE
\r\nNello Musumeci

\r\n\r\n

IL MINISTRO DELL'ECONOMIA E DELLE FINANZE
\r\nGiancarlo Giorgetti

\r\n"},"field_abstract":{"processed":"

Pubblicato nella Gazzetta Ufficiale n. 90 del 17 aprile 2024

\n","value":"

Pubblicato nella Gazzetta Ufficiale n. 90 del 17 aprile 2024

\r\n"},"field_data":"2024-02-26T14:00:26+01:00","field_categoria_primaria":"normativa","field_codice_lingua":false,"fields":{"slug":"/normativa/decreto-del-ministro-la-protezione-civile-e-le-politiche-del-mare-del-26-febbraio-2024-approvazione-del-piano-straordinario-fenomeno-bradisismico/"},"field_link":null,"relationships":{"field_sottodominio":{"name":"Portale"},"field_tipo_provvedimento":[{"drupal_internal__tid":444,"name":"Decreti","field_etichetta_en":"Decrees"},{"drupal_internal__tid":2157,"name":"Decreti del Ministro per la Protezione Civile e le Politiche del mare","field_etichetta_en":"Decreti del Ministro per la Protezione Civile e le Politiche del mare"}],"field_immagine_anteprima":null,"field_immagine_dettaglio":null}},{"title":"Nota del Capo del Dipartimento del 12 dicembre 2023: DL n.140 2023 - art. 4. Trasmissione del documento di Pianificazione speditiva di emergenza per l'area del bradisismo","field_titolo_esteso":"Nota del Capo del Dipartimento del 12 dicembre 2023: DL n.140/2023 - art. 4. Trasmissione del documento di Pianificazione speditiva di emergenza per l'area del bradisismo","body":{"processed":"

In relazione a quanto previsto dall’art. 4 del decreto-legge 12 ottobre 2023, n. 140 recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell’area dei Campi Flegrei”, si trasmette il documento di Pianificazione speditiva di emergenza per l’area del bradisismo elaborato in raccordo con la Regione Campania, con la Prefettura – UTG di Napoli e con gli enti e le amministrazioni territoriali interessate.

\n

La pianificazione in oggetto costituisce il riferimento in cui vengono definite la strategia generale e le principali azioni operative di livello nazionale, regionale e locale finalizzate anche ad un eventuale intervento nazionale sul territorio interessato. I contenuti riportati nel documento rappresentano, quindi, anche un riferimento per l’intervento delle componenti e delle strutture operative del Servizio nazionale della protezione civile.

\n

Il carattere speditivo della pianificazione è tale da non rappresentare esaustivamente le esigenze operative che potrebbero occorrere al manifestarsi di un evento emergenziale. Infatti, le procedure riportate nel documento, sono quelle ritenute più rispondenti agli scenari operativi ipotizzati, che prevedono la conseguente risposta all’emergenza che ciascuna componente, richiamata nel documento, attua in funzione delle proprie responsabilità e competenze. Tale risposta potrà variare in relazione ai reali effetti che si manifestano a seguito dei possibili eventi connessi al bradisismo.

\n

Il documento non sostituisce le pianificazioni di protezione civile vigenti redatte dai diversi livelli di competenza e responsabilità che dovranno essere aggiornate e integrate, laddove necessario, tenendo conto di quanto previsto nella presente pianificazione per favorire la necessaria integrazione delle attività operative.

\n

IL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\nFabrizio Curcio

\n","value":"

In relazione a quanto previsto dall’art. 4 del decreto-legge 12 ottobre 2023, n. 140 recante “Misure urgenti di prevenzione del rischio sismico connesso al fenomeno bradisismico nell’area dei Campi Flegrei”, si trasmette il documento di Pianificazione speditiva di emergenza per l’area del bradisismo elaborato in raccordo con la Regione Campania, con la Prefettura – UTG di Napoli e con gli enti e le amministrazioni territoriali interessate.

\r\n\r\n

La pianificazione in oggetto costituisce il riferimento in cui vengono definite la strategia generale e le principali azioni operative di livello nazionale, regionale e locale finalizzate anche ad un eventuale intervento nazionale sul territorio interessato. I contenuti riportati nel documento rappresentano, quindi, anche un riferimento per l’intervento delle componenti e delle strutture operative del Servizio nazionale della protezione civile.

\r\n\r\n

Il carattere speditivo della pianificazione è tale da non rappresentare esaustivamente le esigenze operative che potrebbero occorrere al manifestarsi di un evento emergenziale. Infatti, le procedure riportate nel documento, sono quelle ritenute più rispondenti agli scenari operativi ipotizzati, che prevedono la conseguente risposta all’emergenza che ciascuna componente, richiamata nel documento, attua in funzione delle proprie responsabilità e competenze. Tale risposta potrà variare in relazione ai reali effetti che si manifestano a seguito dei possibili eventi connessi al bradisismo.

\r\n\r\n

Il documento non sostituisce le pianificazioni di protezione civile vigenti redatte dai diversi livelli di competenza e responsabilità che dovranno essere aggiornate e integrate, laddove necessario, tenendo conto di quanto previsto nella presente pianificazione per favorire la necessaria integrazione delle attività operative.

\r\n\r\n

IL CAPO DEL DIPARTIMENTO DELLA PROTEZIONE CIVILE
\r\nFabrizio Curcio

\r\n"},"field_abstract":null,"field_data":"2023-12-12T11:56:03+01:00","field_categoria_primaria":"normativa","field_codice_lingua":false,"fields":{"slug":"/normativa/nota-del-capo-del-dipartimento-del-12-dicembre-2023-dl-n140-2023-art-4-trasmissione-del-documento-di-pianificazione-speditiva-di-emergenza-larea-del/"},"field_link":null,"relationships":{"field_sottodominio":{"name":"Portale"},"field_tipo_provvedimento":[{"drupal_internal__tid":438,"name":"Circolari, note e procedure","field_etichetta_en":"Circular, notes, procedures"},{"drupal_internal__tid":2286,"name":"Note del Capo Dipartimento","field_etichetta_en":"Head of Departmemt notes"}],"field_immagine_anteprima":null,"field_immagine_dettaglio":null}}]}}},"pageContext":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/","lang":"en","menu":[{"node":{"name":"404","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1471}},{"node":{"name":"Absence rates","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/absence-rates/"},"drupal_internal__nid":738046},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1525}},{"node":{"name":"Accessibility and catalog of data, metadata and databases","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/accessibility-and-catalog-data-metadata-and-databases/"},"drupal_internal__nid":737775},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1599}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/activities/"},"drupal_internal__nid":300002135},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1846}},{"node":{"name":"Activities and procedures","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/"},"drupal_internal__nid":737256},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1546}},{"node":{"name":"Administration payments","weight":15,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/"},"drupal_internal__nid":796389},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1576}},{"node":{"name":"Administrative management provisions","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/"},"drupal_internal__nid":737340},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1554}},{"node":{"name":"Agreements signed by the administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/"},"drupal_internal__nid":794339},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1557}},{"node":{"name":"Ammontare complessivo dei premi","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/ammontare-complessivo-dei-premi/"},"drupal_internal__nid":794015},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1534}},{"node":{"name":"Archive of agreements signed by the administration","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/agreements-signed-administration/archive-agreements-signed-administration/"},"drupal_internal__nid":1047867},"parent":[{"name":"Agreements signed by the administration","drupal_internal__tid":1557}]},"drupal_internal__tid":1558}},{"node":{"name":"Awards data","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/awards-data/"},"drupal_internal__nid":737896},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1535}},{"node":{"name":"Budget and final balance","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/budget-and-final-balance/"},"drupal_internal__nid":737193},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1570}},{"node":{"name":"Budgets","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/"},"drupal_internal__nid":636544},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1568}},{"node":{"name":"Checks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/checks/"},"drupal_internal__nid":739434},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1587}},{"node":{"name":"CIMA Foundation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/cima-foundation/"},"drupal_internal__nid":794079},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1540}},{"node":{"name":"Civic access","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/civic-access/"},"drupal_internal__nid":737795},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1600}},{"node":{"name":"Code of Conduct and Disciplinary Code","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/code-conduct-and-disciplinary-code/"},"drupal_internal__nid":738411},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1507}},{"node":{"name":"Collective negotiation","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/collective-negotiation/"},"drupal_internal__nid":738016},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1528}},{"node":{"name":"Competition announcements","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/competition-announcements/"},"drupal_internal__nid":738532},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1516}},{"node":{"name":"Concession acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/"},"drupal_internal__nid":737855},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1562}},{"node":{"name":"Conferral requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/conferral-requirements/"},"drupal_internal__nid":894080},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1490}},{"node":{"name":"Consultants and collaborators of the Department","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/consultants-and-collaborators-department/"},"drupal_internal__nid":742728},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":2349}},{"node":{"name":"Contact Center","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/"},"drupal_internal__nid":300001715},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1602}},{"node":{"name":"Contacts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts/"},"drupal_internal__nid":300002417},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1604}},{"node":{"name":"Contacts - Ukraine Emergency","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/contacts-ukraine-emergency/"},"drupal_internal__nid":900004388},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1985}},{"node":{"name":"Contributions for meteo-hydro events of May 2013","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/"},"drupal_internal__nid":739484},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1582}},{"node":{"name":"Contributions for meteo-hydro events of October 2018","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-october-2018/"},"drupal_internal__nid":1066704},"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1590}},{"node":{"name":"Controlled bodies","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/"},"drupal_internal__nid":149930},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1537}},{"node":{"name":"Controlled private-law entities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/"},"drupal_internal__nid":149940},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1538}},{"node":{"name":"Controlled public bodies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/"},"drupal_internal__nid":149880},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1542}},{"node":{"name":"Criteria and modalities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/criteria-and-modalities/"},"drupal_internal__nid":737865},"parent":[{"name":"Economic Advantages","drupal_internal__tid":1560}]},"drupal_internal__tid":1561}},{"node":{"name":"Department","weight":136,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1474}},{"node":{"name":"Deputy Head of Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/deputy-head-department/"},"drupal_internal__nid":796275},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1477}},{"node":{"name":"Diploma of public merit","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/diploma-public-merit/"},"drupal_internal__nid":894252},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1493}},{"node":{"name":"Donations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/donations/"},"drupal_internal__nid":900012050},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":2346}},{"node":{"name":"Economic Advantages","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/"},"drupal_internal__nid":153187},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1560}},{"node":{"name":"Emergencies","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Emergenze"}},"drupal_internal__nid":1558},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1621}},{"node":{"name":"Emergencies for environmental, health, technological and fire risk","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-environmental-health-technological-and-fire-risk/"},"drupal_internal__nid":150374},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1592}},{"node":{"name":"Emergencies for meteo-hydro risk","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/"},"drupal_internal__nid":741016},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1581}},{"node":{"name":"Eucentre Foundation","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/eucentre-foundation/"},"drupal_internal__nid":794065},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":1539}},{"node":{"name":"European projects","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/european-projects/"},"drupal_internal__nid":900012016},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1601}},{"node":{"name":"Evaluation board","weight":12,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/evaluation-board/"},"drupal_internal__nid":737996},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1530}},{"node":{"name":"Events","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Eventi"}},"drupal_internal__nid":395},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1628}},{"node":{"name":"Executive terminations","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/executive-terminations/"},"drupal_internal__nid":738096},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1520}},{"node":{"name":"Extraordinary and emergency interventions","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/extraordinary-and-emergency-interventions/"},"drupal_internal__nid":67641},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1498}},{"node":{"name":"Extraordinary and emergency interventions","weight":16,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1580}},{"node":{"name":"FAQ","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Emergencies for meteo-hydro risk","drupal_internal__tid":1581}]},"drupal_internal__tid":1589}},{"node":{"name":"Forms","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1607}},{"node":{"name":"General acts","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/"},"drupal_internal__nid":738451},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1502}},{"node":{"name":"General administrative acts","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/general-administrative-acts/"},"drupal_internal__nid":738431},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1504}},{"node":{"name":"General dispositions","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1500}},{"node":{"name":"Glossary","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1472}},{"node":{"name":"Graphic representation","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/graphic-representation/"},"drupal_internal__nid":740317},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1541}},{"node":{"name":"Head of Department","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/head-department/"},"drupal_internal__nid":796260},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1476}},{"node":{"name":"Holders of executive positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-executive-positions/"},"drupal_internal__nid":738106},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1518}},{"node":{"name":"Holders of political, administrative, management or government positions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/holders-political-administrative-management-or-government-positions/"},"drupal_internal__nid":738381},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1510}},{"node":{"name":"Holders of top management positions in administration","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/holders-top-management-positions-administration/"},"drupal_internal__nid":793762},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1519}},{"node":{"name":"Homepage","weight":0,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1470}},{"node":{"name":"How the contribution is dispensed","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-contribution-dispensed/"},"drupal_internal__nid":739444},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1586}},{"node":{"name":"How to apply","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/how-apply/"},"drupal_internal__nid":739464},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1585}},{"node":{"name":"Information obligations for citizend and firms","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/information-obligations-citizend-and-firms/"},"drupal_internal__nid":738401},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1508}},{"node":{"name":"Informative on personal data processing","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/informative-personal-data-processing/"},"drupal_internal__nid":300002119},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1606}},{"node":{"name":"Insegna","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/insegna/"},"drupal_internal__nid":894264},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1494}},{"node":{"name":"Insurance claims and other contributions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/insurance-claims-and-other-contributions/"},"drupal_internal__nid":739454},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1583}},{"node":{"name":"Integrated Plan of Activities and Organisation (PIAO) 2023-2025","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/integrated-plan-activities-and-organisation-piao-2023-2025/"},"drupal_internal__nid":900009362},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":2186}},{"node":{"name":"Integrative negotiation","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/integrative-negotiation/"},"drupal_internal__nid":738006},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1529}},{"node":{"name":"International Relations","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Relazioni internazionali"}},"drupal_internal__nid":1550},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1622}},{"node":{"name":"International states of emergency","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/international-states-emergency/"},"drupal_internal__nid":740536},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1593}},{"node":{"name":"Latest news","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1610}},{"node":{"name":"Legal Measure","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/legal-measure/"},"drupal_internal__nid":4581},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1550}},{"node":{"name":"List and register of beneficiaries","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/list-and-register-beneficiaries/"},"drupal_internal__nid":894294},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1496}},{"node":{"name":"Maps","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Mappe"}},"drupal_internal__nid":1556},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1627}},{"node":{"name":"Media and Communication","weight":137,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1608}},{"node":{"name":"Media Kit","weight":1,"relationships":{"field_link_menu":null,"parent":[{"name":"Press area","drupal_internal__tid":1609}]},"drupal_internal__tid":1611}},{"node":{"name":"Meritorious Award","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/"},"drupal_internal__nid":300001699},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1489}},{"node":{"name":"Minister","weight":135,"relationships":{"field_link_menu":{"fields":{"slug":"/minister/"},"drupal_internal__nid":900006702},"parent":[]},"drupal_internal__tid":2146}},{"node":{"name":"Mobility procedures","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/mobility-procedures/"},"drupal_internal__nid":738026},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1527}},{"node":{"name":"Monitoraggio tempi procedimentali","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/monitoraggio-tempi-procedimentali/"},"drupal_internal__nid":737236},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1548}},{"node":{"name":"Mortgage payments","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/mortgage-payments/"},"drupal_internal__nid":153207},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1563}},{"node":{"name":"National Recovery and Resilience Plan objectives","weight":11,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Attuazione Misure PNRR"}},"drupal_internal__nid":900004848},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":2016}},{"node":{"name":"National Service","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Servizio Nazionale"}},"drupal_internal__nid":1516},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1619}},{"node":{"name":"Office for the Coordination of Legal, Legislative and Litigation Activities","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-coordination-legal-legislative-and-litigation-activities/"},"drupal_internal__nid":796188},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1931}},{"node":{"name":"Office I - Voluntary work and resources of the National Service","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-i-voluntary-work-and-resources-national-service/"},"drupal_internal__nid":300002401},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1479}},{"node":{"name":"Office II - Technical and scientific activities for risk forecasting and prevention","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-ii-technical-and-scientific-activities-risk-forecasting-and-prevention/"},"drupal_internal__nid":795130},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1480}},{"node":{"name":"Office III - Planning and emergency infrastructure interventions","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iii-planning-and-emergency-infrastructure-interventions/"},"drupal_internal__nid":795657},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1481}},{"node":{"name":"Office IV - Activities for overcoming the emergency","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-iv-activities-overcoming-emergency/"},"drupal_internal__nid":795798},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1482}},{"node":{"name":"Office V - Human and instrumental resources and general operating services","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-v-human-and-instrumental-resources-and-general-operating-services/"},"drupal_internal__nid":795844},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1483}},{"node":{"name":"Office VI - Administration and budget","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/office-vi-administration-and-budget/"},"drupal_internal__nid":100837793},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1484}},{"node":{"name":"Offices outline","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/offices-outline/"},"drupal_internal__nid":738361},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1513}},{"node":{"name":"Operational Director","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/operational-director/"},"drupal_internal__nid":796349},"parent":[{"name":"Structure","drupal_internal__tid":1475}]},"drupal_internal__tid":1478}},{"node":{"name":"Organization","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/"},"drupal_internal__nid":742829},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1509}},{"node":{"name":"Organizational positions","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/organizational-positions/"},"drupal_internal__nid":738076},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1522}},{"node":{"name":"Organizational wellbeing","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/organizational-wellbeing/"},"drupal_internal__nid":737886},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1536}},{"node":{"name":"Other contents","weight":17,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/"},"drupal_internal__nid":737805},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1597}},{"node":{"name":"Payments data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/administration-payments/payments-data/"},"drupal_internal__nid":737310},"parent":[{"name":"Administration payments","drupal_internal__tid":1576}]},"drupal_internal__tid":1577}},{"node":{"name":"Performance","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/"},"drupal_internal__nid":150250},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1531}},{"node":{"name":"Performance measuring and evaluating systems","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-measuring-and-evaluating-systems/"},"drupal_internal__nid":737926},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1532}},{"node":{"name":"Performance plan and report","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/performance/performance-plan-and-report/"},"drupal_internal__nid":737916},"parent":[{"name":"Performance","drupal_internal__tid":1531}]},"drupal_internal__tid":1533}},{"node":{"name":"Permanent commission","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/permanent-commission/"},"drupal_internal__nid":894175},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1492}},{"node":{"name":"Personnel","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/"},"drupal_internal__nid":152494},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1517}},{"node":{"name":"Personnel assigned to offices and services of the Department","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/personnel-assigned-offices-and-services-department/"},"drupal_internal__nid":742010},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1511}},{"node":{"name":"Photo and video","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/photo-and-video-/"},"drupal_internal__nid":4585},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1615}},{"node":{"name":"Plan of indicators and expected budget results","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/budgets/plan-indicators-and-expected-budget-results/"},"drupal_internal__nid":737182},"parent":[{"name":"Budgets","drupal_internal__tid":1568}]},"drupal_internal__tid":1569}},{"node":{"name":"Political bodies provisions","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/political-bodies-provisions/"},"drupal_internal__nid":737350},"parent":[{"name":"Provisions","drupal_internal__tid":1552}]},"drupal_internal__tid":1553}},{"node":{"name":"Premises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/premises/"},"drupal_internal__nid":300001709},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1487}},{"node":{"name":"Press area","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/press-area/"},"drupal_internal__nid":300000472},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1609}},{"node":{"name":"Prevention of corruption","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/other-contents/prevention-corruption/"},"drupal_internal__nid":737785},"parent":[{"name":"Other contents","drupal_internal__tid":1597}]},"drupal_internal__tid":1598}},{"node":{"name":"Procedure for the conferral","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/procedure-conferral/"},"drupal_internal__nid":894164},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1491}},{"node":{"name":"Procedures data","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/administrative-management-provisions/procedures-data/"},"drupal_internal__nid":737330},"parent":[{"name":"Administrative management provisions","drupal_internal__tid":1554}]},"drupal_internal__tid":1555}},{"node":{"name":"Provided services","weight":14,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provided-services/"},"drupal_internal__nid":796136},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1574}},{"node":{"name":"Provisions","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provisions/"},"drupal_internal__nid":153362},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1552}},{"node":{"name":"Publications","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/publications/"},"drupal_internal__nid":1668},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1613}},{"node":{"name":"Q&A","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Domande e risposte"}},"drupal_internal__nid":300000828},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1623}},{"node":{"name":"Recorded costs","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/provided-services/recorded-costs/"},"drupal_internal__nid":796169},"parent":[{"name":"Provided services","drupal_internal__tid":1574}]},"drupal_internal__tid":1575}},{"node":{"name":"Register of companies and procedures for accreditation","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/register-companies-and-procedures-accreditation/"},"drupal_internal__nid":894274},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1495}},{"node":{"name":"Regulations","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/department/meritorious-award/regulations/"},"drupal_internal__nid":894342},"parent":[{"name":"Meritorious Award","drupal_internal__tid":1489}]},"drupal_internal__tid":1497}},{"node":{"name":"Regulatory references on organizations and activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/regulatory-references-organizations-and-activities/"},"drupal_internal__nid":738441},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1503}},{"node":{"name":"ReLuis Consortium","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-public-bodies/reluis-consortium/"},"drupal_internal__nid":794128},"parent":[{"name":"Controlled public bodies","drupal_internal__tid":1542}]},"drupal_internal__tid":1543}},{"node":{"name":"Rental and lease","weight":13,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/rental-and-lease/"},"drupal_internal__nid":150260},"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1571}},{"node":{"name":"Replacement declarations and ex officio acquisition of data","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/replacement-declarations-and-ex-officio-acquisition-data/"},"drupal_internal__nid":737225},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1549}},{"node":{"name":"Request of patronage","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/request-patronage/"},"drupal_internal__nid":300001719},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1488}},{"node":{"name":"RETURN Foundation (Multi- Risk sciEnce for resilienT commUnities underR a changiNg climate)","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/controlled-private-law-entities/return-foundation-multi-risk-science-resilient-communities-underr-changing-climate/"},"drupal_internal__nid":900010280},"parent":[{"name":"Controlled private-law entities","drupal_internal__tid":1538}]},"drupal_internal__tid":2213}},{"node":{"name":"Risks","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Rischi"}},"drupal_internal__nid":440},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1620}},{"node":{"name":"Sanctions for failed data communication","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/sanctions-failed-data-communication/"},"drupal_internal__nid":900000844},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1512}},{"node":{"name":"Sanctions for failed data communication","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/sanctions-failed-data-communication/"},"drupal_internal__nid":793791},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1521}},{"node":{"name":"Service Features","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/service-features/"},"drupal_internal__nid":100838033},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1603}},{"node":{"name":"Sitemap","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/homepage/sitemap/"},"drupal_internal__nid":422},"parent":[{"name":"Homepage","drupal_internal__tid":1470}]},"drupal_internal__tid":1473}},{"node":{"name":"Social","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/media-and-communication/social/"},"drupal_internal__nid":300001731},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1614}},{"node":{"name":"Special cases","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/special-cases/"},"drupal_internal__nid":739424},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1588}},{"node":{"name":"States of emergency for seismic risk","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-seismic-risk/"},"drupal_internal__nid":740582},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1591}},{"node":{"name":"States of emergency not managed by the Department","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/states-emergency-not-managed-department/"},"drupal_internal__nid":740513},"parent":[{"name":"Extraordinary and emergency interventions","drupal_internal__tid":1580}]},"drupal_internal__tid":1594}},{"node":{"name":"Strategic and management planning documents","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/general-acts/strategic-and-management-planning-documents/"},"drupal_internal__nid":738421},"parent":[{"name":"General acts","drupal_internal__tid":1502}]},"drupal_internal__tid":1505}},{"node":{"name":"Structure","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/structure/"},"drupal_internal__nid":300001707},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1475}},{"node":{"name":"Subsidiary companies","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/subsidiary-companies/"},"drupal_internal__nid":740276},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1544}},{"node":{"name":"Supervised public bodies","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/controlled-bodies/supervised-public-bodies/"},"drupal_internal__nid":740266},"parent":[{"name":"Controlled bodies","drupal_internal__tid":1537}]},"drupal_internal__tid":1545}},{"node":{"name":"Supplementary worksheet","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/-supplementary-worksheet/"},"drupal_internal__nid":1374051},"parent":[{"name":"Media and Communication","drupal_internal__tid":1608}]},"drupal_internal__tid":1612}},{"node":{"name":"Systematic equipment","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/systematic-equipment/"},"drupal_internal__nid":738066},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1523}},{"node":{"name":"Tasks assigned and authorized to public servants","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/tasks-assigned-and-authorized-public-servants/"},"drupal_internal__nid":738036},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1526}},{"node":{"name":"Technical attachments to the ordinances for recognition of the requirements","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/legal-measure/technical-attachments-ordinances-recognition-requirements/"},"drupal_internal__nid":741657},"parent":[{"name":"Legal Measure","drupal_internal__tid":1550}]},"drupal_internal__tid":1551}},{"node":{"name":"Telephone and email","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/organization/telephone-and-email/"},"drupal_internal__nid":793720},"parent":[{"name":"Organization","drupal_internal__tid":1509}]},"drupal_internal__tid":1514}},{"node":{"name":"Temporary personnel","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/personnel/temporary-personnel/"},"drupal_internal__nid":738056},"parent":[{"name":"Personnel","drupal_internal__tid":1517}]},"drupal_internal__tid":1524}},{"node":{"name":"Tender and contract list","weight":0,"relationships":{"field_link_menu":null,"parent":[{"name":"Tenders and contracts","drupal_internal__tid":1559}]},"drupal_internal__tid":1878}},{"node":{"name":"Tenders and contracts","weight":10,"relationships":{"field_link_menu":null,"parent":[{"name":"Transparent administration","drupal_internal__tid":1499}]},"drupal_internal__tid":1559}},{"node":{"name":"Thematic areas","weight":145,"relationships":{"field_link_menu":null,"parent":[]},"drupal_internal__tid":1617}},{"node":{"name":"Three-year plan for the prevention of corruption and transparency","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/general-dispositions/three-year-plan-prevention-corruption-and-transparency/"},"drupal_internal__nid":738461},"parent":[{"name":"General dispositions","drupal_internal__tid":1500}]},"drupal_internal__tid":1501}},{"node":{"name":"Training","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Formazione"}},"drupal_internal__nid":1566},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1624}},{"node":{"name":"Transfers for civil protecion emergencies","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-civil-protecion-emergencies/"},"drupal_internal__nid":990363},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1564}},{"node":{"name":"Transfers for national and international civil protection exercises","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-national-and-international-civil-protection-exercises/"},"drupal_internal__nid":152541},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1565}},{"node":{"name":"Transfers ruled by art.11","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-ruled-art11/"},"drupal_internal__nid":795880},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1566}},{"node":{"name":"Transfers to the Regions for the management of hydro-meteo-pluviometric networks","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/economic-advantages/concession-acts/transfers-regions-management-hydro-meteo-pluviometric-networks/"},"drupal_internal__nid":149758},"parent":[{"name":"Concession acts","drupal_internal__tid":1562}]},"drupal_internal__tid":1567}},{"node":{"name":"Transparent administration","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/transparent-administration/"},"drupal_internal__nid":399},"parent":[{"name":"Department","drupal_internal__tid":1474}]},"drupal_internal__tid":1499}},{"node":{"name":"Type of damage and goods elegible for contribution","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/extraordinary-and-emergency-interventions/emergencies-meteo-hydro-risk/contributions-meteo-hydro-events-may-2013/type-damage-and-goods-elegible-contribution/"},"drupal_internal__nid":739474},"parent":[{"name":"Contributions for meteo-hydro events of May 2013","drupal_internal__tid":1582}]},"drupal_internal__tid":1584}},{"node":{"name":"Types of procedure","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/department/transparent-administration/activities-and-procedures/types-procedure/"},"drupal_internal__nid":737246},"parent":[{"name":"Activities and procedures","drupal_internal__tid":1546}]},"drupal_internal__tid":1547}},{"node":{"name":"Volunteering","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Volontariato"}},"drupal_internal__nid":1568},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1618}},{"node":{"name":"Write to Contact Center","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/department/contact-center/write-contact-center/"},"drupal_internal__nid":300001729},"parent":[{"name":"Contact Center","drupal_internal__tid":1602}]},"drupal_internal__tid":1605}},{"node":{"name":"Young people","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/"},"relationships":{"field_sottodominio":{"name":"Giovani"}},"drupal_internal__nid":1546},"parent":[{"name":"Thematic areas","drupal_internal__tid":1617}]},"drupal_internal__tid":1625}}],"menuMinisito":[{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/"},"drupal_internal__nid":155570},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1637}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/"},"drupal_internal__nid":332227},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1664}},{"node":{"name":"Activities","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/activities/"},"drupal_internal__nid":155580},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1698}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/activities/"},"drupal_internal__nid":173667},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1704}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/activities/"},"drupal_internal__nid":76954},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1708}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/health/activities/"},"drupal_internal__nid":174762},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1712}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/activities/"},"drupal_internal__nid":155600},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1718}},{"node":{"name":"Activities","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/industrial/activities/"},"drupal_internal__nid":900011896},"parent":[{"name":"Industrial","drupal_internal__tid":1721}]},"drupal_internal__tid":1722}},{"node":{"name":"Activities","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/activities/"},"drupal_internal__nid":900011918},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2342}},{"node":{"name":"Alert","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/"},"drupal_internal__nid":300001721},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1668}},{"node":{"name":"Alerts and criticality scenarios table","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/alerts-and-criticality-scenarios-table/"},"drupal_internal__nid":811957},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1669}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/are-you-prepared/"},"drupal_internal__nid":50697},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1659}},{"node":{"name":"Are you prepared?","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/are-you-prepared/"},"drupal_internal__nid":51053},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1672}},{"node":{"name":"Are you prepared?","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/are-you-prepared/"},"drupal_internal__nid":76780},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1699}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/are-you-prepared/"},"drupal_internal__nid":173571},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1705}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/are-you-prepared/"},"drupal_internal__nid":175007},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1710}},{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/health/are-you-prepared/"},"drupal_internal__nid":174881},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1713}},{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/are-you-prepared/"},"drupal_internal__nid":54323},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1719}},{"node":{"name":"Are you prepared?","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/industrial/are-you-prepared/"},"drupal_internal__nid":900011902},"parent":[{"name":"Industrial","drupal_internal__tid":1721}]},"drupal_internal__tid":1723}},{"node":{"name":"Are you prepared?","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/are-you-prepared/"},"drupal_internal__nid":900011444},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2303}},{"node":{"name":"Are you prepared?","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/are-you-prepared/"},"drupal_internal__nid":900011920},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2343}},{"node":{"name":"Bradyseism in the Phlegraean Fields","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/"},"drupal_internal__nid":900011500},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":2297}},{"node":{"name":"Census of historical centers exposed to seismic risk","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/census-historical-centers-exposed-seismic-risk/"},"drupal_internal__nid":174642},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1648}},{"node":{"name":"Central Functional Centre","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/"},"drupal_internal__nid":635282},"parent":[{"name":"Activities","drupal_internal__tid":1664}]},"drupal_internal__tid":1665}},{"node":{"name":"Colli Albani","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/colli-albani/"},"drupal_internal__nid":669834},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1694}},{"node":{"name":"Earthquakes","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/earthquakes/"},"drupal_internal__nid":177296},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1636}},{"node":{"name":"Effects","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/effects/"},"drupal_internal__nid":900011916},"parent":[{"name":"Large dams","drupal_internal__tid":2340}]},"drupal_internal__tid":2341}},{"node":{"name":"Emergency planning and damage scenarios","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/"},"drupal_internal__nid":67126},"parent":[{"name":"Activities","drupal_internal__tid":1637}]},"drupal_internal__tid":1641}},{"node":{"name":"Environmental","weight":89,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental-0/"},"drupal_internal__nid":100838003},"parent":[]},"drupal_internal__tid":1715}},{"node":{"name":"Etna","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/etna/"},"drupal_internal__nid":52987},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1683}},{"node":{"name":"Events","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/events/"},"drupal_internal__nid":177145},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1663}},{"node":{"name":"Exposure","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/exposure/"},"drupal_internal__nid":818432},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1643}},{"node":{"name":"Fire","weight":87,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/forest-fire-risk/"},"drupal_internal__nid":100837999},"parent":[]},"drupal_internal__tid":1706}},{"node":{"name":"Forest fire","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/forest-fire/"},"drupal_internal__nid":175145},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1707}},{"node":{"name":"Health","weight":88,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/health-risk/"},"drupal_internal__nid":100838001},"parent":[]},"drupal_internal__tid":1711}},{"node":{"name":"In-depth information","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/depth-information/"},"drupal_internal__nid":900002364},"parent":[{"name":"Seismic","drupal_internal__tid":1634}]},"drupal_internal__tid":1661}},{"node":{"name":"In-depth information","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/depth-information/"},"drupal_internal__nid":300000886},"parent":[{"name":"Meteo-Hydro","drupal_internal__tid":1662}]},"drupal_internal__tid":1674}},{"node":{"name":"In-depth information","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/depth-information/"},"drupal_internal__nid":300000888},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1701}},{"node":{"name":"In-depth information","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/fire/depth-information/"},"drupal_internal__nid":880060},"parent":[{"name":"Fire","drupal_internal__tid":1706}]},"drupal_internal__tid":1709}},{"node":{"name":"In-depth information","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/health/depth-information/"},"drupal_internal__nid":300000872},"parent":[{"name":"Health","drupal_internal__tid":1711}]},"drupal_internal__tid":1714}},{"node":{"name":"In-depth information","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/environmental/depth-information/"},"drupal_internal__nid":880127},"parent":[{"name":"Environmental","drupal_internal__tid":1715}]},"drupal_internal__tid":1716}},{"node":{"name":"In-depth information","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/nuclear/depth-information/"},"drupal_internal__nid":300000920},"parent":[{"name":"Nuclear","drupal_internal__tid":1717}]},"drupal_internal__tid":1720}},{"node":{"name":"Industrial","weight":91,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/industrial-risk-of-major-accident/"},"drupal_internal__nid":100838007},"parent":[]},"drupal_internal__tid":1721}},{"node":{"name":"Infographic on meteo-hydro alert","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/infographic-meteo-hydro-alert/"},"drupal_internal__nid":863087},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1671}},{"node":{"name":"International Commission on Earthquake Forecasting for Civil Protection","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/international-commission-earthquake-forecasting-civil-protection/"},"drupal_internal__nid":78718},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1842}},{"node":{"name":"Ischia","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/ischia/"},"drupal_internal__nid":61420},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1691}},{"node":{"name":"Large dams","weight":92,"relationships":{"field_link_menu":{"fields":{"slug":"/large-dams/"},"drupal_internal__nid":900011972},"parent":[]},"drupal_internal__tid":2340}},{"node":{"name":"Lipari","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/lipari/"},"drupal_internal__nid":669794},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1695}},{"node":{"name":"Meteo-Hydro","weight":84,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/meteo-hydro/"},"drupal_internal__nid":100837987},"parent":[]},"drupal_internal__tid":1662}},{"node":{"name":"Meteo-hydro warning on regional structures websites","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/alert/meteo-hydro-warning-regional-structures-websites/"},"drupal_internal__nid":152310},"parent":[{"name":"Alert","drupal_internal__tid":1668}]},"drupal_internal__tid":1670}},{"node":{"name":"Monitoring","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/monitoring/"},"drupal_internal__nid":900011440},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2301}},{"node":{"name":"Monitoring and Surveillance","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/monitoring-and-surveillance/"},"drupal_internal__nid":781665},"parent":[{"name":"Central Functional Centre","drupal_internal__tid":1665}]},"drupal_internal__tid":1667}},{"node":{"name":"National plan for seismic risk prevention","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/"},"drupal_internal__nid":67766},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1649}},{"node":{"name":"Nuclear","weight":90,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/nuclear-risk/"},"drupal_internal__nid":100838005},"parent":[]},"drupal_internal__tid":1717}},{"node":{"name":"Oss - Seismic Observatory of Structures","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/oss-seismic-observatory-structures/"},"drupal_internal__nid":66117},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1646}},{"node":{"name":"Panarea","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/panarea/"},"drupal_internal__nid":669754},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1696}},{"node":{"name":"Pantelleria","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/pantelleria/"},"drupal_internal__nid":669874},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1693}},{"node":{"name":"Past events","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/past-events/"},"drupal_internal__nid":900011438},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2300}},{"node":{"name":"Phlegraen Fields","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/"},"drupal_internal__nid":53007},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1688}},{"node":{"name":"Prediction","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/meteo-hydro/activities/central-functional-centre/prediction/"},"drupal_internal__nid":793535},"parent":[{"name":"Central Functional Centre","drupal_internal__tid":1665}]},"drupal_internal__tid":1666}},{"node":{"name":"Q&A","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/qa/"},"drupal_internal__nid":900012590},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2365}},{"node":{"name":"RAN- National Accelerometric Network","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/ran-national-accelerometric-network/"},"drupal_internal__nid":50727},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1645}},{"node":{"name":"School Building Safety","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/school-building-safety/"},"drupal_internal__nid":67605},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1658}},{"node":{"name":"Seismic","weight":83,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic-0/"},"drupal_internal__nid":100838041},"parent":[]},"drupal_internal__tid":1634}},{"node":{"name":"Seismic classification","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-classification/"},"drupal_internal__nid":50717},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1642}},{"node":{"name":"Seismic Microzonation","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-microzonation/"},"drupal_internal__nid":52740},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1647}},{"node":{"name":"Seismic vulnerability","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/seismic-vulnerability/"},"drupal_internal__nid":818402},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1644}},{"node":{"name":"Stromboli","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/stromboli/"},"drupal_internal__nid":70237},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1678}},{"node":{"name":"Submarine volcanoes","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/submarine-volcanoes/"},"drupal_internal__nid":71589},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1697}},{"node":{"name":"Technical committee activities","weight":10,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/technical-committee-activities/"},"drupal_internal__nid":900002628},"parent":[{"name":"Emergency planning and damage scenarios","drupal_internal__tid":1641}]},"drupal_internal__tid":1947}},{"node":{"name":"Technical Committee for the support and monitoring of Seismic Microzonation studies (Opcm No. 3907)","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/technical-committee-support-and-monitoring-seismic-microzonation-studies-opcm-no-3907/"},"drupal_internal__nid":67796},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1650}},{"node":{"name":"The current crisis","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/current-crisis/"},"drupal_internal__nid":900011436},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2299}},{"node":{"name":"The National Emergency Planning for volcanic risk in the Phlegraean Fields","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/national-emergency-planning-volcanic-risk-phlegraean-fields/"},"drupal_internal__nid":1145410},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":1690}},{"node":{"name":"The phenomenon","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/phenomenon/"},"drupal_internal__nid":900011434},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2298}},{"node":{"name":"The Rapid Emergency Planning for the bradyseism in the Phlegraean Fields","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/rapid-emergency-planning-bradyseism-phlegraean-fields/"},"drupal_internal__nid":900011446},"parent":[{"name":"Phlegraen Fields","drupal_internal__tid":1688}]},"drupal_internal__tid":2304}},{"node":{"name":"The response of the National Service","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/response-national-service/"},"drupal_internal__nid":900011442},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2302}},{"node":{"name":"Timeline","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/phlegraen-fields/bradyseism-phlegraean-fields/timeline/"},"drupal_internal__nid":900012588},"parent":[{"name":"Bradyseism in the Phlegraean Fields","drupal_internal__tid":2297}]},"drupal_internal__tid":2363}},{"node":{"name":"Tsunami","weight":86,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/tsunami-risk/"},"drupal_internal__nid":100837991},"parent":[]},"drupal_internal__tid":1702}},{"node":{"name":"Tsunami","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/tsunami/tsunami/"},"drupal_internal__nid":168546},"parent":[{"name":"Tsunami","drupal_internal__tid":1702}]},"drupal_internal__tid":1703}},{"node":{"name":"Vesuvio","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/vesuvio/"},"drupal_internal__nid":52997},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1685}},{"node":{"name":"Volcanic","weight":85,"relationships":{"field_link_menu":{"fields":{"slug":"/sezione-con-anticipazioni/volcanic-risk/"},"drupal_internal__nid":100837997},"parent":[]},"drupal_internal__tid":1675}},{"node":{"name":"Volcanic eruption","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanic-eruption/"},"drupal_internal__nid":175290},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1676}},{"node":{"name":"Volcanoes in Italy","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/"},"drupal_internal__nid":176435},"parent":[{"name":"Volcanic","drupal_internal__tid":1675}]},"drupal_internal__tid":1677}},{"node":{"name":"Vulcano","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/volcanic/volcanoes-italy/vulcano/"},"drupal_internal__nid":171319},"parent":[{"name":"Volcanoes in Italy","drupal_internal__tid":1677}]},"drupal_internal__tid":1681}},{"node":{"name":"Year 2010","weight":9,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2010/"},"drupal_internal__nid":174140},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1657}},{"node":{"name":"Year 2011","weight":8,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2011/"},"drupal_internal__nid":174117},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1656}},{"node":{"name":"Year 2012","weight":7,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2012/"},"drupal_internal__nid":173729},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1655}},{"node":{"name":"Year 2013","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2013/"},"drupal_internal__nid":173393},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1654}},{"node":{"name":"Year 2014","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2014/"},"drupal_internal__nid":173311},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1653}},{"node":{"name":"Year 2015","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2015/"},"drupal_internal__nid":670284},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1652}},{"node":{"name":"Year 2016","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2016/"},"drupal_internal__nid":989251},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1651}},{"node":{"name":"Year 2022 - 2023","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/year-2022-2023/"},"drupal_internal__nid":900009956},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":2199}},{"node":{"name":"Years 2019 - 2020 - 2021","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/seismic/activities/emergency-planning-and-damage-scenarios/national-plan-seismic-risk-prevention/years-2019-2020-2021/"},"drupal_internal__nid":900004376},"parent":[{"name":"National plan for seismic risk prevention","drupal_internal__tid":1649}]},"drupal_internal__tid":1989}}],"menuFooter":[{"node":{"name":"Certified mail PEC","weight":3,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/posta-elettronica-certificata---pec--versione-inglese-/"},"drupal_internal__nid":300000300}},"drupal_internal__tid":1890}},{"node":{"name":"Contacts","weight":6,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/contacts/"},"drupal_internal__nid":300001713}},"drupal_internal__tid":1893}},{"node":{"name":"Glossary","weight":0,"relationships":{"field_link_menu":{"fields":{"slug":"/elenco-glossario--versione-inglese-/"},"drupal_internal__nid":1664}},"drupal_internal__tid":1887}},{"node":{"name":"Legal notes","weight":5,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/note-legali/"},"drupal_internal__nid":300001711}},"drupal_internal__tid":1892}},{"node":{"name":"Modules","weight":2,"relationships":{"field_link_menu":{"fields":{"slug":"/department/forms/"},"drupal_internal__nid":300001717}},"drupal_internal__tid":1889}},{"node":{"name":"Online services","weight":1,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/online-services/"},"drupal_internal__nid":300001701}},"drupal_internal__tid":1888}},{"node":{"name":"Privacy","weight":4,"relationships":{"field_link_menu":{"fields":{"slug":"/approfondimento/privacy-0/"},"drupal_internal__nid":300001705}},"drupal_internal__tid":1891}}],"socialImg":null}},"staticQueryHashes":[]}